17.06.2013 Views

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RESOLUTION NO. _<br />

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GLENDALE<br />

CERTIFYING AND ADOPTING A SECOND ADDENDUM TO<br />

THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE<br />

SAN FERNANDO ROAD CORRIDOR REDEVELOPMENT<br />

PROJECT AREA PLAN (DREAMWORKS ANIMATION<br />

CAMPUS EXPANSION PROJECT) AND MAKING FINDINGS<br />

IN CONNECTION THEREWITH<br />

WHEREAS, on November 17. 1992, the Agencycertified and adopted a Final Program Environmental<br />

Impact Report rProgram FEIR- or MFEIR"}for the San Fernando Road Corridor Redevelopment Project Area<br />

Plan, which FEIR analyzed the series <strong>of</strong> actions contemplated under the Redevelopment Plan, including<br />

proposed land uses, infrastructure policies, and regulations and examined the proposals for upgrading<br />

commercial, industrial and public properties within the Plan area including the existing and future development<br />

<strong>of</strong> an estimated 2.3 million square feet <strong>of</strong> commercial and related space, 1.48 million square feet <strong>of</strong> industrial<br />

space and 548 residential units; and<br />

WHEREAS, the FEIRfor the Redevelopment Plan included the allowable land uses and development<br />

standards for the Redevelopment Plan area in general and the OreamWorks Campus in particular; and<br />

WHEREAS, on June 4, 1996, the Agency certified a First Addendum to the FEIR which Addendum<br />

analyzed the OreamWorks Campus proposal within the context <strong>of</strong> the certified program FEIR and determined<br />

that the proposal did not require any important revision to the FEIR, did not constitute a substantial change<br />

in circumstances, and did not create any new significant effects not examined in the Program FEIR; and<br />

WHEREAS, a Second Addendum to the Program FEIR has been prepared to address the potential<br />

environmental effects <strong>of</strong> building out the OreamWorks campus under the Industrial Mixed-Use/Large Scale<br />

Project designation in the INO zoning district <strong>of</strong> the San Fernando Road Corridor Project Area; <strong>of</strong> revising the<br />

building height limit <strong>of</strong> 65 feet to a height <strong>of</strong> 175 feet or 10 stories permitted under the new Industrial Mixed-<br />

Use/Large Scale Project zoning designation; <strong>of</strong> installing a new employee and fire gale access on Flower<br />

Street and associated surface paving and landscaping activities; and<br />

WHEREAS, Agency and <strong>City</strong> staff have evaluated the proposed Project changes pursuant 10<br />

California Environmental Quality Act rCEQA") and relevant code requirements and have determined that the<br />

1<br />

1 A

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!