17.06.2013 Views

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Drainage.<br />

4. 3. Water (Hydrology)<br />

1. The <strong>City</strong> <strong>of</strong> <strong>Glendale</strong> Department <strong>of</strong> Public Services, Los Angeles County Flood<br />

Control District, and, U.S. Army Corps <strong>of</strong> Engineers shaH review and approve<br />

project storm drain plans prior to project construction.<br />

2. At the project level, developers shall comply with NPDES pennit requirements<br />

within the construction area, to maintain the existing drainage flow and to collect<br />

excess water and sediments flowing from construction sites. (Existing<br />

requirement enforced through standard <strong>City</strong> procedures).<br />

3. At the project level, developers shall be required to submit erosion control plans<br />

if required by the <strong>City</strong> Engineer for approval prior to the release <strong>of</strong> a grading<br />

permit during the rainy season <strong>of</strong> November 15 - April 15.<br />

4. Necessary storm drain improvements shall be constructed on site or within the<br />

adjacent public right <strong>of</strong> way as practicable as part <strong>of</strong> the proposed project.<br />

5. Necessary storm drain improvements shall be constructed as part <strong>of</strong> the proposed<br />

project.<br />

Flooding. No applicable mitigation measures are contained in the Program EIR.<br />

. Surface/Groundwater Resources. The only appropriate groundwater mitigation<br />

measure would be review by a hydrological engineer, as indicated below: 28<br />

6. Specific· projects proposed within the Project Area shall be reviewed for their<br />

effect on groundwater quality by a hydrology engineer. Mitigation required as<br />

the result <strong>of</strong> review shall be implemented by the Developer/Participant.<br />

28 Program EIR. Final EIR Volume, pages 3.3-4 and 3.3-5.<br />

Planning ConsulranlS Research<br />

<strong>Glendale</strong> Redevelopment Agency<br />

Page 40<br />

DreamWorks Animation Cam.- Addendum ElK<br />

JUI1C 1996

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!