17.06.2013 Views

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4. 7. Risk <strong>of</strong> Upset<br />

3. Contingency plans for worker's protection should be developed, including<br />

monitoring and response if odors or elevated levels <strong>of</strong> volatile organic vapors or<br />

soil contamination are encountered during excavation. These plans should<br />

include a provision for handling excess amounts <strong>of</strong> potentially contaminated<br />

groundwater.<br />

4. To minimize the possibility <strong>of</strong> migration <strong>of</strong> volatile organic vapors from the<br />

groundwater table up into excavation areas under the proposed structures, slabson-grade<br />

shall include a visqueen layer, for the purposes <strong>of</strong> creating a moisture<br />

seal and vapor barrier.<br />

Planning Consultams Research<br />

<strong>Glendale</strong> Redevelopment Agency<br />

Page 63<br />

DreamWorks Animation Campus Addendum EIR<br />

June 1996

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!