17.06.2013 Views

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4. 12. 4. Natural Gas<br />

Industrial density assumption in the Program ErR is also identified. The natural gas consumed<br />

by the average Restricted Industrial use (see Section 2, Project Overview, <strong>of</strong> this document) on<br />

the original 12.21 acre (per County Assessor's records) site was determined to be 43,837 cubic<br />

feet per day, or 10,163 cubic feet per day less than the theoretical project. This small<br />

increment represents an insignificant 0.06 percent increase in the total 1.61 million cubic feet<br />

that would be consumed by the entire Redevelopment Area, including existing development.<br />

MITIGATION MEASURES<br />

. The following mitigation measure from the Program EIR may be applicable to the<br />

proposed project: 95<br />

1. Specific measures recommended to reduce natural gas consumption include:<br />

• Use <strong>of</strong> an automatic flue gas damper when using a gas heating system;<br />

• Use <strong>of</strong> electrically-lighted pilot lights for all gas systems;<br />

• Insulation <strong>of</strong> all gas-heated hot water tanks; and<br />

• Installation or retr<strong>of</strong>itting with solar water heaters.<br />

95 Program EIR, Final EIR Volume, page 3.12-12.<br />

PlaMing Consultants Research<br />

<strong>Glendale</strong> Redevelopment Agency<br />

Page 110<br />

DreamWorks Animation Campus Addendum EIR<br />

June 1996

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!