4. 12. 1. Water<br />

system due to completion <strong>of</strong> the Redevelopment Plan would be adverse, but less than significant<br />

with implementation <strong>of</strong> the mitigation measures identified in the Program EIR.<br />

PROJECT IMPACTS<br />

The proposed DreamWorks Animation Campus site is currently served by an 8 inch<br />

water line along Flower Street. A reclaimed water delivery system should be completed before<br />

project completion and may be accessible to the project site. Due to the currently low water<br />

pressure within the Redevelopment area, project needs for water pressure for fire flow will need<br />

to be satisfied. <strong>Glendale</strong> Fire Department review and Project compliance with fire flow<br />

requirements will be required. Based upon the Restricted Industrial rates contained in the<br />

Program EIR, the proposed project would consume 123,750 gpd <strong>of</strong> water, resulting in less than<br />

significant impacts with the implementation <strong>of</strong> the recommended mitigation measures and the<br />

reclaimed water delivery system being built by the <strong>City</strong> <strong>of</strong> <strong>Glendale</strong>.<br />

Although water consumption for the project is included in the Redevelopment Area<br />

generation projections, a worst case analysis is provided herein to determine the project's impact<br />

in relation to the Redevelopment Area as a whole and to account for the project's increase in<br />

water consumption above and beyond the Program EIR's assumptions for the Redevelopment<br />

Area. An average sized Restricted Industrial use, based on the original 12.21 acre site (per<br />

County Assessor's records), is taken from the estimated average Restricted Industrial use floor<br />

area ratio, as discussed in Section 2, Project Overview, <strong>of</strong> this document. A comparison<br />

indicates that the proposed project would consume 123,750 gpd <strong>of</strong> water, while the average<br />

restricted industrial use on the proposed site would consume 99,640 gpd. This 24,110 gpd<br />

increase in water consumed by the project represents approximately 0.7 percent <strong>of</strong> the total<br />

built-out Redevelopment Plan daily water demand <strong>of</strong> 3,443.5mgd, including existing uses. As<br />

a percentage increase in overall demand, the project demand would be less than significant<br />

representing an anticipated variation in density which is normal and expected within the<br />

Redevelopment Plan parameters and underlying Program EIR assumptions. Project water<br />

consumption is almost entirely within the overall Redevelopment Plan projections for water<br />

consumption, is well within the expected range <strong>of</strong> results for a program <strong>of</strong> this magnitude, and<br />

does not approach the significance thresholds identified in the Program EIR.<br />

PlaMing Consullants Research<br />

<strong>Glendale</strong> Redevelopment Agt'ncy<br />

Page 102<br />

DreamWorks Animation Campus Addendum EIR<br />

June 1996

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!