17.06.2013 Views

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Case No. 9557-$<br />

1000 Flower Street<br />

12. That adequate means be provided for the collection <strong>of</strong> solid waste<br />

generated at the site and that all recyclable items be collected<br />

and properly disposed <strong>of</strong> to the satisfaction <strong>of</strong> the Integrated<br />

Waste Management Administrator <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Glendale</strong>.<br />

13. That all pertinent mitigation measures listed in the DreamWorks<br />

Animation Campus Addendum to the Program EIR for the Redevelopment<br />

Plan for the San Fernando Road Corridor shall be met.<br />

14. That parking as required and provided herein shall be for the<br />

exclusive use <strong>of</strong> occupants/guests for the buildings on campus<br />

only. Any other uses <strong>of</strong> parking spaces will require prior<br />

approval <strong>of</strong> the Zoning Administrator.<br />

15. That a grading permit shall be obtained and site grading done to<br />

the satisfaction <strong>of</strong> the <strong>City</strong> Engineer.<br />

16. That minimum vertical clearance for accessibility and location <strong>of</strong><br />

path to accessible parking spaces, ramps and entrance<br />

accessibilities as required by the accessibility requirements <strong>of</strong><br />

the California Building Standards Code and Permit Services Section<br />

shall be met.<br />

17. That uniformed security guard service shall be provided 24 hours<br />

per day on site during construction to the satisfaction <strong>of</strong> the<br />

Chief <strong>of</strong> Police.<br />

18. That on-site construction work with the exception <strong>of</strong> interior<br />

tenant improvements or other interior work after the building<br />

shell is completed shall commence at 7:00 a.m. and end at 7:00<br />

p.m. during summer months and 7:00 a.m. to 6:00 p.m. after summer.<br />

Any deviations from this schedule shall be approved by the<br />

<strong>Director</strong> <strong>of</strong> Public Works.<br />

19. That construction workers shall be required to park inside the<br />

construction site and not on the streets.<br />

20. That loading and unloading <strong>of</strong> materials and deliveries during and<br />

after construction shall occur on-site and scheduling must be<br />

coordinated to avoid stacking <strong>of</strong> any trucks on the streets.<br />

21. That no storage <strong>of</strong> goods, materials, equipment, etc., shall be<br />

done on the public right-<strong>of</strong>-way without proper permits and<br />

approval from the <strong>Director</strong> <strong>of</strong> Public Works.<br />

22. That the five (S) transmission facility equipment shall be located<br />

a minimum <strong>of</strong> ten (10) feet from any property line. They shall be<br />

constructed <strong>of</strong> open mesh material unless otherwise required by the<br />

data transmission requirements and as approved by the Zoning<br />

Administrator. Antennas and supporting structures shall be a<br />

neutral color which blends with the surrounding colors as approved<br />

by the Zoning Administrator.<br />

4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!