17.06.2013 Views

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 14<br />

4. 9. Transportation/Circulation<br />

YEAR 2010 INTERSECTION LEVELS OF SERVICE WITH REDEVELOPMENT PLAN GROWTH<br />

(Without <strong>Development</strong> on the Project Site)<br />

Year 2010<br />

Year 2010 Cumulative Base<br />

Cumulative Base with Redevelopment<br />

Existing (Unmitigated) Mitigations<br />

Intersection Hour VIC LOS VIC LOS VIC LOS<br />

I. Lake Street & A.M. Peak 0.35 A 0.47 A<br />

Sonora Avenue P.M. Peak 0.39 A 0.59 A<br />

2. Flower Street & A.M. Peak 0.59 A 1.01 F<br />

Western Avenue<br />

P.M. Peak 0.84 D 1.49 F<br />

3. Flower Street & A.M. Peak 0.46 A 0.62 B<br />

Sonora Avenue<br />

P.M. Peak 0.53 A 0.73 C<br />

4. San Fernando Road & A.M. Peak 0.76 C 0.96 E 0.75 C<br />

Sonora Avenue P.M. Peak 0.73 C 0.88 0 0.88 0<br />

5. San Fernando Road & A.M. Peak 0.63 B 0.85 D 0.78 B<br />

Grandview Avenue<br />

P.M. Peak 0.86 D 1.08 F 0.82 D<br />

6. San Fernando Road & A.M. Peak 0.66 B 0.83 0<br />

a<br />

Highland Avenue P.M. Peak 0.68 B 0.86 D<br />

a<br />

7. San Fernando Road & A.M. Peak 0.61 B 0.74 C<br />

a<br />

Fairmont Avenue P.M. Peak 0.67 B 0.78 C<br />

a<br />

8. San Fernando Road & A.M. Peak 0.70 B 0.83 D 0.79 C<br />

Doran Street<br />

P.M. Peak 0.79 C 1.11 F 0.84 D<br />

9. San Fernando Road & A.M. Peak 0.52 A 0.63 B<br />

a<br />

California Avenue P.M. 'Peak 0.61 B 0:77 C<br />

a<br />

10. San Fernando Road & A.M. Peak 0.51 A 0.62 B<br />

a<br />

Broadway<br />

P.M. Peak 0.71 C 0.84 D<br />

a<br />

II. Flower Street & A.M. Peak 2.0 A 2.8 A<br />

a<br />

Grandview Avenue C<br />

P.M. Peak 2.2 A 5.3 B<br />

a<br />

a Intersection is not impacted, therefore. no mitigation is required.<br />

b Intersection is impacted, however, no mitigation is recommended in the Redevelopment Plan Program EIR.<br />

e Intersection controlled by stop signs On all approaches. Indicates average delay (in seconds) and LOS for the<br />

intersection.<br />

Planning ConsullanlS Research<br />

<strong>Glendale</strong> Redevelopment Agency<br />

Page 78<br />

DreamWorks Animation Campus Addendum EIR<br />

. June 1996<br />

a<br />

a<br />

b<br />

b<br />

a<br />

a

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!