17.06.2013 Views

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MITIGATION MEASURES<br />

4. 12. I. Water<br />

Implementation <strong>of</strong> mitigation measures 1 through 7, as identified in the Program EIR<br />

and set forth below, may be required for the proposed project.87<br />

1. Developers shall work with the <strong>City</strong> during the design phase to ensure adequate<br />

water supply and service to the proposed project.<br />

2. Individual development plans shall be submitted to the <strong>Glendale</strong> Fire Department<br />

for review to ensure that adequate fire flows are provided to the project site prior<br />

to final project approval.<br />

3. Developers shall be responsible for funding the construction <strong>of</strong> all <strong>of</strong>f-site storage<br />

. tanks and pump stations as required to adequately serve the subject property.<br />

4. Building construction shall include water conservation devices such as low flow<br />

toilets, low volume shower heads, tum <strong>of</strong>f adapters and faucet flow control.<br />

5. <strong>Development</strong> projects shall have a minimum <strong>of</strong> landscaping requiring heavy<br />

irrigation and shall include drought resistant planting.<br />

6. <strong>Development</strong> plans shall be reviewed by the <strong>City</strong> to ensure that adequate flows<br />

can be provided prior to project approval.<br />

7. Sections <strong>of</strong> Title 20 and Title 24 <strong>of</strong> the California Code <strong>of</strong> Regulations regarding<br />

water consumption and conservation will be enforced.<br />

87 Program EIR. Final EIR Volume, page 3.12-4.<br />

Planning Consultants Research<br />

<strong>Glendale</strong> Redevelopment Agency<br />

Page 103<br />

DreamWorks Animation Campus Addendum ElK<br />

June 1996

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!