4. 1. Earth<br />

4. An erosion control plan shall be required and subject to review and approval by<br />

the <strong>City</strong> Engineer. This plan shall contain detailed, verifiable procedures and<br />

methods for implementing this plan. Components <strong>of</strong> an erosion control plan may<br />

include, but not be limited to, the following:<br />

Temporary culverts, ditches, dams, settling ponds, sandbagging, or<br />

similar measures to be installed where needed during construction<br />

activities to collect excess water and sediments flowing out <strong>of</strong><br />

construction sites and to reduce erosion;<br />

Straw, hydroseeding, mulching, soil binders, or other suitably acceptable<br />

materials or techniques to be instituted for uncovered soils, as needed,<br />

during construction activities for the duration <strong>of</strong> these activities; and<br />

Postponing grading activities during periods when wind gusts exceed 25<br />

mph and during the rainy season. 12 The rainy season is generally<br />

considered to run from November 15 through April 15.<br />

It is understood that this provision is intended to mean that grading activities could be suspended during a rain<br />

storm, but not throughout the rainy season.<br />

Planning Consultants Research<br />

<strong>Glendale</strong> Redevelopment Agency<br />

Page 25<br />

DreamWorks Animation Campus Addendum Em<br />

June 1996