17.06.2013 Views

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Land Use acre S9.Ft.<br />

Animalion Studio 13.4 495,000 Rate a. b<br />

a Rates are per 1.000 sq.jt.<br />

Table 15<br />

ESTIMATED PROJECT TRIP GENERATION<br />

4. 9. TransponalionJCirculalion<br />

Size A.M. Peak Hour P.M. Peak Hour<br />

Trips<br />

In<br />

1.07<br />

530<br />

b Trip generation rates for the proposed project were developed using DreamWorks Playa Vista rates. assuming<br />

40% <strong>of</strong>fice and 60% production/stage suppon.<br />

Impact Criteria<br />

In accordance with the evaluation conducted in the Redevelopment Plan FEIR and in<br />

recognition <strong>of</strong> <strong>City</strong> <strong>of</strong> <strong>Glendale</strong> level <strong>of</strong> service standards, a project traffic impact would be<br />

considered significant if one <strong>of</strong> the following conditions are met:<br />

Out<br />

0.13<br />

64<br />

Total<br />

1.20<br />

594<br />

In<br />

0.19<br />

94<br />

Out<br />

0.90<br />

446<br />

Total<br />

• the addition <strong>of</strong> project traffic to an intersection operating at LOS A, B, C, or D<br />

causes the intersection operation to decline to LOS E or F; or<br />

• the addition <strong>of</strong> project traffic to an intersection operating at LOS E causes an<br />

increase in the intersection VIC ratio <strong>of</strong> 0.02 or more; or<br />

• the addition <strong>of</strong> project traffic to an intersection operating at LOS F causes an<br />

increase in the intersection VIC ratio <strong>of</strong> 0.01 or more.<br />

Project Impact Analysis<br />

The Year 2010 traffic forecasts with development <strong>of</strong> the proposed project were analyzed<br />

to determine the projected future peak hour levels <strong>of</strong> service at the eleven study intersections,<br />

assuming implementation <strong>of</strong>those elements <strong>of</strong>the Redevelopment Plan FEIR mitigation program<br />

identified previously as necessary by the Year 2010. Table 16 on page 82 summarizes the<br />

results <strong>of</strong> this analysis. As indicated on Table 16, the project is projected to have an impact<br />

on Year 2010 conditions with the Redevelopment Plan mitigation at one <strong>of</strong> the eleven analyzed<br />

intersections: Flower Street/Western Avenue.<br />

Planning Consultants Rcsearch<br />

Glendalc RflicYclopmcnt Agcncy<br />

Page 81<br />

1.09<br />

540<br />

DrcamWorks Animation Campus Addendum EIR<br />

June 1996

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!