17.06.2013 Views

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1. INTRODUCTION<br />

This document is an Addendum to the Final Environmental Impact Report for the San<br />

Fernando Road Corridor Redevelopment Plan (hereafter, Redevelopment Plan) which was<br />

certified on November 17, 1992 (Resolution No. 480) by the <strong>Glendale</strong> Redevelopment Agency.<br />

The Final Environmental Impact Report (hereafter, Program EIR) is comprised <strong>of</strong> an Initial<br />

Study, which is appended to the Draft EIR; the Draft EIR with technical appendices dated July<br />

13, 1992; and the Final EIR volwne dated November 12, 1992. A program EIR is defmed in<br />

Section 15168(a) <strong>of</strong> the CEQA Guidelines as an EIR which may be prepared on a series <strong>of</strong><br />

actions which are related to one another and can be characterized as one large project. Under<br />

Section 15180(b) <strong>of</strong> the California Environmental Quality Act (CEQA) Guidelines, "An EIR on<br />

a redevelopment plan is to be treated as a program EIR. .. ".<br />

The subject <strong>of</strong> this Addendum is a site specific project, the DreamWorks Animation<br />

Campus, proposed by DreamWorks SKG on a site located within the San Fernando Road<br />

Corridor Redevelopment Area. This document is an Addendum to the Program EIR, responsive<br />

to Section 15168(c) <strong>of</strong> the CEQA Guidelines addressing program EIRs, which states,<br />

"...Subsequent activities in the program must be examined in the light <strong>of</strong> the program EIR to<br />

determine whether an additional environmental document must be prepared." Section 15168(c)4<br />

<strong>of</strong> the CEQA Guidelines states further that, "Where subsequent activities involve site specific<br />

operations, the agency should use a written checklist or similar device to document the<br />

evaluation <strong>of</strong> the site and the activity to detennine whether the environmental effects <strong>of</strong> the<br />

operations were covered in the program EIR. "<br />

The DreamWorks Animation Campus project consists <strong>of</strong> a site specific project located<br />

within the Redevelopment Area. As such, it is a subsequent activity to the Redevelopment<br />

program. An addendum is a more comprehensive form <strong>of</strong> documentation than a written<br />

checklist, and has been selected to address the potential environmental consequences <strong>of</strong> the<br />

project in the context <strong>of</strong> those attributable to the Redevelopment Plan, as documented in the<br />

EIR. Pursuant to Sections 15162(a) and 15164(e) <strong>of</strong> the CEQA Guidelines, preparation <strong>of</strong> a<br />

subsequent EIR was determined not to be appropriate. As evidenced by the analyses and<br />

conclusions presented in this Addendum, the proposed site specific project does not represent<br />

substantial change in the underlying Redevelopment Plan assumptions regarding the project site<br />

made in the EIR, and neither such differences between the project and the Redevelopment Plan<br />

as will exist, nor new information not available at the time the EIR was prepared, will involve<br />

Planning ConsultantS Research<br />

<strong>Glendale</strong> Redevelopment Agency<br />

Page 1<br />

DreamWorks Animation Campus Addendwn EIR<br />

June 1996

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!