17.06.2013 Views

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Second Addendum to the Program EIR, DrcmnWorks Campus<br />

Page 2]<br />

previously identified in the Program ElR. The development <strong>of</strong> the Dream\XIorks campus<br />

falls within the pr<strong>of</strong>.t.le <strong>of</strong> traffic impacts in the Program EIR.<br />

Analysis <strong>of</strong> Proposed Project Impacts<br />

The proposed designation <strong>of</strong> the Dream\X/orks campus as an Industrial Mixed Use/Large<br />

Scale Project In rhe IND zomng district, revision <strong>of</strong> the heighr limit, and construction <strong>of</strong> a<br />

scconJalY access gate would noT result in any new transportation and circulation impacTs not<br />

previously analyzed :md disclosed ill the Program ElR. The total amount <strong>of</strong> Jevelopment<br />

permitted on the site would not change, and furore development on the Dream\Vorks<br />

campus would be subject to the mitib>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!