17.06.2013 Views

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

REDEVELOPMENT PLAN IMPACTS<br />

4. ENVIRONMENTAL Il\1PACT ANALYSIS<br />

4.10. P<strong>UBLIC</strong> SERVICES<br />

4.10.3. SCHOOLS<br />

The Program EIR defmes impacts on schools as the following:<br />

"Impacts _on school districts are considered significant if the project will result<br />

in generation <strong>of</strong> students and demands for school services which exceed the short<br />

or long-term capacity <strong>of</strong> district facilities, and normal district fInancing sources<br />

will not <strong>of</strong>fset project-related costs <strong>of</strong> providing additional facilities and<br />

services. ,,73<br />

The <strong>Glendale</strong> Unified School District (District) provides public education for children<br />

residing in the Redevelopment Area. According to the District, all but three (Keppel<br />

Elementary, Mountain Avenue Elementary and Crescenta Valley High School) <strong>of</strong> the District's<br />

26 elementary, junior high, and high schools are currently overcrowded, and all schools within<br />

the District fall below the "Enrollment Site Standards" set by the Urban Planning and Design<br />

Criteria. In order to expand District facilities, the District levies developer fees <strong>of</strong> $1.72 per<br />

square foot <strong>of</strong> residential, and $0.28 per square foot <strong>of</strong> non-residential development.74 In<br />

addition, school construction costs are estimated to be $10,000 per student. 75<br />

Student generation occurs both directly from new residential development and indirectly<br />

from non-residential development. The units proposed in the Redevelopment Plan will generate<br />

468 new students in the District over the 20-year horizon <strong>of</strong> the plan, based on the District's<br />

student generation factor <strong>of</strong> 0.4 students per residential unit. 76 This will result in a total<br />

student population in the Redevelopment Area at buildout <strong>of</strong> 1,169. Due to the current<br />

overcrowded conditions at District schools, along with the existing extensive use <strong>of</strong> portable<br />

73 Program EIR. Final EIR Volume, page 3.10-9.<br />

74 Ibid, page 3.10-7.<br />

75 The District in its comments on the Draft EIR indicated that school construction costs $125.00persquarefoot<br />

and an average <strong>of</strong>80 squarefeet per student. Therefore on average. school cons/ruction costs $10. ()()(). 00per<br />

student.<br />

76 Program EIR. Final EIR Volume. page 3.J()"J2.<br />

Planning Consultan!$ Research<br />

<strong>Glendale</strong> Redevelopment Agency<br />

Page 93<br />

DreamWorks Animation Campus AcIdenclum EIR<br />

June 1996

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!