17.06.2013 Views

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

REDEVELOPMENT PLAN IMPACTS<br />

4. ENVIRONMENTAL IM:PACT ANALYSIS<br />

4.12. mll..rrIES<br />

4.12.3. ELECTRICITY<br />

The Program EIR states that project impacts on electrical services would be considered<br />

significant under the following circumstances: 92<br />

"Impacts on electrical utilities are considered significant if the proposed project<br />

would require significant expansion to existing energy systems, such as a new<br />

generation plant, or the development <strong>of</strong> new sources <strong>of</strong> power. "<br />

Electrical service is provided by the <strong>City</strong> <strong>of</strong> <strong>Glendale</strong> Department <strong>of</strong> Public Service. It<br />

is anticipated that the <strong>City</strong> can service all the electricity that will be required through the end<br />

<strong>of</strong> the century, at which point· other sources <strong>of</strong> power will need to be obtained.<br />

Completion <strong>of</strong>the Redevelopment Plan would result in the consumption <strong>of</strong>approximately<br />

1,499 megawatt hours (mWh) <strong>of</strong> electricity per day. Such an increase would require 12<br />

kilovolts <strong>of</strong> capacity to be added to the project area.<br />

PROJECT IMPACTS<br />

Based upon the consumption rates for Restricted Industrial uses contained in the Program<br />

EIR, electricaf consumption for the DrearnWorks project will be 61.03 mWh per day. No<br />

element <strong>of</strong> on-site electrical usage would be excessive or wasteful. Therefore, given the current<br />

and future availability <strong>of</strong> electricity as stated in the Program EIR, the project would not have<br />

a significant impact on the <strong>City</strong>'S supply <strong>of</strong> electricity with implementation <strong>of</strong> the mitigation<br />

measures identified in the Program EIR.<br />

Although electrical consumption for the project is for the· most part included in the<br />

Redevelopment Plan generation projections, the increment <strong>of</strong> electrical consumption attributable<br />

to the difference between the project, as proposed. and an average Restricted Industrial density<br />

92 Program EIR, Final EIR Volume, page 3.12-9.<br />

Planning Consullants Research<br />

<strong>Glendale</strong> Redevelopment Agency<br />

Page 107<br />

DreamWorks Animation CamplQ Addendum EIR<br />

June 1996

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!