17.06.2013 Views

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4. 10. 3. Schools<br />

square feet <strong>of</strong> nonresidential development proposed ($0.27 per square feet) 79, resulting in a<br />

(Otal fee <strong>of</strong> $133,650. As with the Redevelopment Plan as a whole, developer fees would not<br />

cover all construction costs related to the additional 46 students, but would substantially mitigate<br />

the impact to below a significant level. Remaining construction costs would require additional<br />

State funds.<br />

In order to identify how the project impacts relate to the Redevelopment Plan, this<br />

evaluation estimates the impact generated from development on the project site using the<br />

Program EIR's average intensity assumptions (FAR) for Restricted Industrial uses on an 12.2<br />

acre site (per Assessor's parcel data). Based upon these averaged asswnptions, the proposed<br />

project's site would contain a total <strong>of</strong> 398,900 square feet <strong>of</strong> development, 1,116 employees.<br />

and 112 new residents. These residents would require 88 new housing units based on the<br />

regional average <strong>of</strong> 1.22 jobs per housing unit. Utilizing the District's 0.4 students per unit<br />

generation rate, these units would increase the student population in the District by 35, or 11<br />

fewer students than the DreamWorks Animation Campus project.<br />

This difference <strong>of</strong> 11 new students represents 2.3 percent <strong>of</strong> the total students generated<br />

with buildout <strong>of</strong> the Redevelopment Plan. Similarly. the proposed project would result in<br />

increased school costs over those required using the Program EIR's average intensity<br />

assumptions. An additional $110,000 in construction costs would be required; and an additional<br />

$30,446 in developer fees would in part pay for these added construction costs. As with student<br />

generation, these figures represented 2.4 percent <strong>of</strong> the totals for the Redevelopment Plan as<br />

a whole. These are paid in part by developer fees. Although the student generation and school<br />

developer fees estimated with implementation <strong>of</strong> the proposed project would be slightly greater<br />

than that assumed with the averaging <strong>of</strong> the Redevelopment Area, it represents a small and<br />

statistically insignificant proportion <strong>of</strong> the total growth.<br />

Although less than significant, this difference in the actual student and school cost<br />

generation and the averaged student and school cost generation is consistent with the Plan<br />

because the Redevelopment Plan anticipates variation in development densities on different sites<br />

and therefore variation in student generation from these sites. Because <strong>of</strong> the existing<br />

overcrowding in District schools, and developer fees not fully covering school construction<br />

costs, the proposed project could result in a potentially significant impact. The developer fees<br />

79<br />

The non-residential development fee is currently $0.28per square fOOl and will go up 10 $0.30persquarefoot<br />

on June 1, 1996. However, for comparison purposes, the rate <strong>of</strong> $0.27 per square fOOl, as found in the<br />

Program EIR, is utilized here.<br />

Planning ConsulQnlS Rcsealdl<br />

<strong>Glendale</strong> Redevelopment Agency<br />

Page 95<br />

DreamWorks ADimation Campus Addendlllll EIR<br />

. June 1996

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!