(2) Twisted or kinked flex supply line<br />

- Should be a requirement within the st<strong>and</strong>ard as to materials resistance <strong>and</strong> integrity.<br />

- Performance of the meter after a period of accelerated life testing<br />

- Repeatability of test: tolerance of 0.6 percent as shown in H<strong>and</strong>book 44 is too tight.<br />

Repeatability test not applicable to ASME st<strong>and</strong>ard.<br />

- Laboratory testing applies to more than one meter of a given model or type.<br />

- In California, 3 of each meter model are currently tested based upon a r<strong>and</strong>om<br />

selection from among 30 submitted.<br />

- All meter orientations should be specified by the manufacturer <strong>and</strong> indicated on the<br />

meter (A= all positions; H =horizontal positions, within 10 degrees; V = vertical<br />

positions, within 10 degrees; I = inclined positions, at 30 degrees, 45 degrees, 60<br />

degrees)<br />

Conclusions based upon committee’s comments:<br />

Several POU meter manufacturers propose that the current plumbing codes be modified<br />

for several testing parameters, including levels of accuracy. These manufacturers are not<br />

proposing to change the current accuracy st<strong>and</strong>ard of +/- 1.5% under ideal testing conditions.<br />

They are proposing, however, that the accuracy level be changed for low flows <strong>and</strong> for the<br />

impact of various adverse conditions such as meter orientation, temperature changes <strong>and</strong> piping<br />

configurations to +3% to –5%. Table 8.1 summarizes their position in regard to the various<br />

elements of the current ASME code for accuracy <strong>and</strong> testing parameters. The committee feels<br />

that a plumbing st<strong>and</strong>ard is needed for POU meter installations <strong>and</strong> should consider using<br />

AWWA M 6 manual, which covers utility meter installation. The manufacture must also specify<br />

installation criteria.<br />

250