05.11.2014 Views

national multiple family submetering and allocation billing program ...

national multiple family submetering and allocation billing program ...

national multiple family submetering and allocation billing program ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

xxxiii<br />

Submetering<br />

Method<br />

Efficient<br />

Fixtures?<br />

Table ES.1.9 Cost <strong>and</strong> benefit per unit analysis for owners who chose to submeter<br />

Annual<br />

Water Use*<br />

(gal/du)<br />

Useful<br />

Life †<br />

(years)<br />

Annual<br />

Value of<br />

Water <strong>and</strong><br />

Sewer<br />

Benefits ‡<br />

PV of<br />

Benefits §<br />

Capital or “First” Costs ($/du)<br />

Receiver,<br />

Computer,<br />

<strong>and</strong><br />

Software ††<br />

Meter,<br />

Transmitter,<br />

<strong>and</strong><br />

Installation **<br />

Fixture<br />

Replacement<br />

‡‡<br />

Annual<br />

Service<br />

Fee §§<br />

Meter<br />

Replacement<br />

***<br />

PV of<br />

Costs †††<br />

Submeter - New<br />

Construction<br />

Yes 52,195 20 $275 $3,428 $125 $25 $0 $ 36 $125 $675 5.1<br />

Submeter - Yes 52,195 20 $275 $3,428 $300 $25 $0 $ 36 $125 $850 4.0<br />

Retrofit No 52,195 20 $275 $3,428 $300 $25 $255 $ 36 $125 $1,105 3.1<br />

POU metering ‡‡‡ Yes 52,195 20 $275 $3,428 $560 $25 $0 $ 36 $300 $1,597 2.1<br />

No 52,195 20 $275 $3,428 $560 $25 $255 $ 36 $300 $1,852 1.9<br />

* Based on the total water use of the average in-rent unit (143.0 gal/du/day)<br />

† Assumes that Automatic Meter Reading (AMR) equipment is used, <strong>and</strong> that based on current technology, that the battery life is limited to 10 years, <strong>and</strong> it is best to<br />

replace the entire meter, register, transmitter, <strong>and</strong> battery at same time (even though st<strong>and</strong>ard life for a meter is 15 years). Assumes that POUs will need to be<br />

replaced every 5 years.<br />

‡ Based on a commodity charge for water <strong>and</strong> wastewater of $5.27 per kgal (the average commodity charge for the thirteen study sites).<br />

§ The present value of annually occurring benefits is calculated with a discount rate of 5%.<br />

** May vary by property <strong>and</strong> location.<br />

†† Calculated on a per property basis. This assumes a $2,500 base cost spread over 100 units.<br />

‡‡ Includes hardware <strong>and</strong> installation cost for a dwelling unit that is retrofit with 1.2 toilets for $234, 2 aerators for $4, <strong>and</strong> 1 showerhead for $17. Not applicable to<br />

dwelling units that have already been equipped with hardware operating within 125% of EPACT st<strong>and</strong>ards. Only accounts for the first time cost, does not account for<br />

any ongoing replacement/maintenance schedule at the property.<br />

§§ Assumes monthly service fee of $3 is paid by owner.<br />

*** Replacement costs for submeters (which will be replaced every 10 years) <strong>and</strong> POU meters (which will be replaced every 5 years).<br />

††† The present value of annually occurring costs is calculated at a discount rate of 5%.<br />

‡‡‡ Assumes 7 meters per apartment, <strong>and</strong> $80 per meter (includes hardware <strong>and</strong> installation).<br />

B/C<br />

Ratio

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!