18.11.2014 Views

STANDARD HANDBOOK OF PETROLEUM & NATURAL GAS ...

STANDARD HANDBOOK OF PETROLEUM & NATURAL GAS ...

STANDARD HANDBOOK OF PETROLEUM & NATURAL GAS ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

586 Drilling and Well Completions<br />

C AS E "A" C A S E "E" C A S E "C"<br />

Sheaves<br />

S =6<br />

L: Load; S=No. of Sheaves; N = No. of Rope Ports Supporting Load<br />

FAST LINE TENSION = FAST LINE FACTOR X LOAD<br />

1 2 3 4 5 6 7 8 9 10 11 le 13<br />

Plain Bearing Sheaves<br />

Roller Bearing Sheaves<br />

= 109. K = 1.04.<br />

Efficiency Fast Line Factor<br />

e<br />

Efficiency Fast Line Factor<br />

case case case case CMe cw cw case case case case case<br />

N A B C A B C A B C A B C<br />

2 380 .807 .740 368 .620 .675 943 ,907 .E72 .530 .551 ,574<br />

3 844 .774 .710 .395 .431 .469 .E5 .889 .855 .360 ,375 990<br />

4 810 .743 .682 .309 836 .367 .908 373 .839 275 586 298<br />

5 .778 .714 ,655 357 .280 805 890 356 .823 .225 234 243<br />

6 .748 .686 .629 .223 .243 265 874 ffl0 .808 .191 .198 206<br />

7 .719 360 .605 .I99 216 236 ,857 .824 ,793 .167 .173 .I80<br />

8 .692 ,635 ,582 .181 ,197 215 .842 ,809 ,778 .l48 .154 .I61<br />

9 .666 ,611 ,561 ,167 ,182 .198 .826 ,794 ,764 .135 ,140 ,145<br />

10 ,642 .589 540 ,156 .170 .185 311 ,780 ,750 ,123 ,128 ,133<br />

11 ,619 .568 ,521 ,147 .160 .173 .796 ,766 .736 .114 ,119 .124<br />

12 ,597 .547 .502 ,140 .I52 .166 .782 ,752 .723 ,106 .I11 .115<br />

13 576 .528 .485 .I33 .145 ,159 .768 ,739 ,710 .1W ,104 .IO8<br />

14 556 ,510 ,468 .128 .140 .153 .755 ,725 ,698 ,095 .D99 .I02<br />

15 ,537 ,493 .452 ,124 .135 .147 ,741 .713 ,685 .OW ,094 .OS7<br />

I<br />

EFFICIENCY = A Fast Line Factor =<br />

K'N (K-1) N x EFFICIENCY<br />

NOTE The above canes apply aIw where the rope is dead ended at the lower or traveling block or<br />

demck floor after passinp over a dead sheave in the crown.<br />

'In h tables the I( factor for sheave friction iu 1.09 for plain bearinna and 1.M for mller bearinna.<br />

O W K factors cam bc u d if rsammmded by r(lc equipment manufacturer.<br />

Figure 4-68. Efficiency of wire-rope reeving for multiple sheave blocks,<br />

Cases A, B, and C [ll].<br />

The following precautions should be observed to prevent premature wire<br />

breakage in drilling lines.<br />

1. Cable-tool drilling lines. Movement of wire rope against metallic parts can<br />

accelerate wear. This can also create sufficient heat to form martensite,<br />

causing embrittlement of wire and early wire rope removal. Such also can<br />

be formed by friction against the casing or hard rock formation.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!