18.11.2014 Views

STANDARD HANDBOOK OF PETROLEUM & NATURAL GAS ...

STANDARD HANDBOOK OF PETROLEUM & NATURAL GAS ...

STANDARD HANDBOOK OF PETROLEUM & NATURAL GAS ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Air and Gas Drilling 851<br />

[-a<br />

Rotating<br />

1 \<br />

PIPE RAMS<br />

I<br />

Figure 4-189. BOP stack arrangement for low cellar rig.<br />

2. Close the blind rams, open the rotating head to release the 3 + in. stripper<br />

rubber, pull the rotating table bushings and raise the last joint of drill<br />

collar, remove the bit, and lay this joint down (remove the 3 in. stripper<br />

rubber from this drill collar joint for later use).<br />

3. Place the new 4 + in. stripper rubber for the rotating head on the first joint<br />

of 4 + in. liner joint. This liner joint should have the casing shoe and float<br />

valve made up to the bottom end. Lower this first joint of liner through<br />

the rotary table opening until the 4+ in. stripper rubber can be secured<br />

in the rotating head. Once the 44 in. stripper rubber is in place in the<br />

rotating head, secure the stripper rubber by closing the rotating head.<br />

4. Open the blind rams, and continue to lower the 4+ in. liner through the<br />

rotary table opening using the casing slips.<br />

5. Make up the liner hanger to the last liner joint while holding the liner<br />

string in the casing slips. Make up the first joint of the 3 4 in. drill pipe<br />

to the liner hanger, remove the casing slips and lower the liner string on<br />

the 3 in. drill pipe into the borehole until the 3 + in. drill pipe is adjacent<br />

to the 3+ in. pipe rams, close the 3 + in. pipe rams onto the 3 + in. drill<br />

pipe and replace the rotary table bushings. Place at least three joints of

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!