Hoisting System 611<br />

I 2 3 4 5 6 7<br />

DESIGN FACTOR<br />

Figure 4-85. Relationship between design factors and ton-mile service factors [11].*<br />

NOTE: Light loads can cause rope to wear out from fatigue prior to accumulation of anticipated<br />

ton-miles.<br />

'Based on laboratory tests of bending over sheaves.<br />

in the operation. A program should be "tailored" to the individual rig. The<br />

condition of the line as moved through the reeving system and the condition<br />

of the cutoff portions will indicate whether the proper goal was selected. In all<br />

cases, visual inspection of the wire rope by the operator should take precedence<br />

over any predetermined procedures. (See Figure 4-86 for a graphical comparison<br />

of rope services.)