Hoisting System 609<br />

to supply an excess of drilling line over that required to string up, and to slip<br />

this excess through the system at such a rate that it is evenly worn and that the<br />

line removed by cutoff at the drum end has just reached the end of its useful life.<br />

Initial Length of Line. The relationship between initial lengths of rotary lines<br />

and their normal service life expectancies is shown in Figure 4-83. Possible<br />

savings by the use of a longer line may be offset by an increased cost of handling<br />

for a longer line.<br />

IC<br />

w<br />

c)<br />

9<br />

a<br />

2 7<br />

W<br />

v)<br />

f 6<br />

0<br />

a<br />

w ' 5<br />

a<br />

-<br />

3 4<br />

w<br />

><br />

5 3<br />

w<br />

a 2<br />

I<br />

1000 2000 3000 4OOO 5OOO 6000 7000<br />

ROTARY LINE INITIAL LENGTH,FT.<br />

Figure 4-83. Relationship between rotary-line initial length and service life [11].*<br />

*Empirical curves developed from general field experience.