18.11.2014 Views

STANDARD HANDBOOK OF PETROLEUM & NATURAL GAS ...

STANDARD HANDBOOK OF PETROLEUM & NATURAL GAS ...

STANDARD HANDBOOK OF PETROLEUM & NATURAL GAS ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Hoisting System 605<br />

20<br />

I I I 1 I I I<br />

tn<br />

W<br />

w<br />

I<br />

tn<br />

a<br />

W<br />

><br />

18<br />

16<br />

0 12<br />

W<br />

LL<br />

14<br />

4<br />

12 14 16 18 20 22 24 26 28<br />

DT/d RATIOS<br />

D, = tread diameter of sheave, inches (mm) (see Fig. 4-73)<br />

d = nominal rope diameter, inches (mm).<br />

Figure 4-79. Relative service for various Dfd ratios for sheaves [ill.’<br />

See “Diameter of Sheaves,” subparagraph titled ”Variation for Different Service Applications.”<br />

‘Based on laboratory tests involving systems consisting of sheaves only.<br />

For the comparative evaluation of service from rotary drilling lines, the grand<br />

total of ton-miles of work performed will be the sum of the ton-miles for all<br />

round-trip operations (Equation 4-26), the ton-miles for all drilling operations<br />

(Equation 4-27), the ton-miles for all coring operations (Equation 4-29), the tonmiles<br />

for all casing setting operations (Equation 4-30), and the ton-miles for all<br />

short trip operations (Equation 4-33). By dividing the grand total ton-miles for

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!