Directive 065: Resources Applications for Oil and Gas Reservoirs ...
Directive 065: Resources Applications for Oil and Gas Reservoirs ...
Directive 065: Resources Applications for Oil and Gas Reservoirs ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Requirements<br />
4) If there are per<strong>for</strong>ations above 600 m KB,<br />
identification of the base of groundwater<br />
protection (BGWP) (mKB).<br />
5) a) Identification of the source (intervals),<br />
composition, <strong>and</strong> volumes of the water,<br />
<strong>and</strong><br />
b) a discussion of how anticipated water<br />
production was estimated or how<br />
produced water was measured or<br />
estimated.<br />
6) If the applicant is proposing to produce nonsaline<br />
water, the number of the water<br />
diversion permit that has been obtained from<br />
Alberta Environment.<br />
7) A figure showing the water-bearing<br />
interval(s) in relation to all per<strong>for</strong>ations<br />
within 25 m of the water-bearing interval or<br />
the shallowest productive per<strong>for</strong>ated<br />
interval.<br />
8) A copy of the results of a water well test<br />
analysis if conducted; if not conducted, an<br />
explanation of why a test was not<br />
conducted.<br />
Comments<br />
The BGWP may be obtained from the data<br />
provided in ERCB ST55-2007: Alberta’s<br />
Base of Groundwater Protection (BGWP)<br />
In<strong>for</strong>mation or from your own analysis. If<br />
you have completed your own analysis, you<br />
must include the geological <strong>and</strong>/or technical<br />
in<strong>for</strong>mation to support your pick of the<br />
BGWP in the application.<br />
You must conduct sampling <strong>and</strong> analysis of<br />
the water in accordance with <strong>Directive</strong> 044.<br />
Well licensees are responsible <strong>for</strong> ensuring<br />
that the volume of water produced from a<br />
well is measured accurately.<br />
The Water Act prohibits the production on<br />
non-saline water unless such production is<br />
approved by a water diversion permit<br />
obtained from Alberta Environment.<br />
You must evaluate whether there are water<br />
wells within the 600 m radius <strong>and</strong> 25 m depth<br />
<strong>for</strong> all wells in the pools proposed <strong>for</strong><br />
commingling, even if the application itself is<br />
<strong>for</strong> a single well, as the ERCB will consider<br />
approving commingling on a pool rather than<br />
well basis only in exceptional circumstances<br />
as required by Section 3.050 of the OGCR.<br />
If you offered to test the water well but the<br />
owner of the water well rejected the offer, a<br />
statement should be made in the application<br />
to this effect.<br />
9) A copy of the fluid analysis <strong>for</strong> each pool<br />
<strong>and</strong> coal <strong>and</strong> shale zone proposed <strong>for</strong><br />
commingling.<br />
10) Confirmation that the infrastructure to<br />
produce <strong>and</strong> transport the reservoir fluid is<br />
appropriate <strong>for</strong> the commingled production<br />
stream.<br />
ERCB <strong>Directive</strong> <strong>065</strong>: <strong>Resources</strong> <strong>Applications</strong> / Commingled Production (October 2011) • 3-25