01.12.2014 Views

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Completing the Modify Spacing Application—Holdings or Units<br />

Section 1: Notification Requirements<br />

1) Is notification required <strong>for</strong> the application as per <strong>Directive</strong> <strong>065</strong>?<br />

If yes, you must continue to answers questions 2 to 6 which are the same as questions 1 to 5<br />

described in Section 7.6.2.1 in Unit 7 of <strong>Directive</strong> <strong>065</strong>.<br />

If no, questions 2 to 6 are not required.<br />

Section 5: Holding or Units<br />

1) Does each applied-<strong>for</strong> holding have common ownership at the lessor <strong>and</strong> lessee levels?<br />

Select YES if your proposed holding contains only a single DSU or whole <strong>and</strong> contiguous DSUs<br />

of common ownership (Section 5.200 of the OGCR).<br />

If you select NO, the application cannot be filed.<br />

2) Are you removing the interwell distance provision <strong>for</strong> a previously approved holding?<br />

If yes, notification in accordance with <strong>Directive</strong> <strong>065</strong> is required. If notification was not conducted<br />

the application cannot be filed.<br />

If no, notification may not be required.<br />

3) Are you amending a previously approved buffer zone to reflect the regulation target area <strong>for</strong><br />

the province?<br />

If yes, notification in accordance with <strong>Directive</strong> <strong>065</strong> is required. If notification was not conducted<br />

the application cannot be filed.<br />

4) Are you re-aligning holding boundaries <strong>for</strong> a previously approved holding?<br />

Select YES if you are re-aligning holding boundaries <strong>for</strong> a previously approved holding due to a<br />

change in mineral ownership.<br />

Select NO if you are not re-aligning holding boundaries.<br />

5) Are you changing any provisions other than those outlined in questions 2, 3, <strong>and</strong> 4? If yes,<br />

please describe those changes in Section 2 of Schedule 1 in the Application Description box.<br />

If YES you must clearly describe what is being changed in Section 2 of Schedule 1 in the<br />

Application Description Box. If additional in<strong>for</strong>mation beyond what is provided in the description<br />

box is necessary to describe the requested change please provide the additional in<strong>for</strong>mation in an<br />

application attachment.<br />

Select NO if you are not change any provisions other than those described in questions 2, 3, <strong>and</strong><br />

4.<br />

6) Enter the well density of the holding to be modified. Well density provisions cannot be<br />

increased using the modify application <strong>for</strong>m.<br />

The well density entered on the <strong>for</strong>m must match the well density in the existing approval. Well<br />

density is defined as the number of wells per pool per area. Enter the well density <strong>and</strong> then select<br />

the well density area. Possible well density areas are<br />

ERCB <strong>Directive</strong> <strong>065</strong>: <strong>Resources</strong> <strong>Applications</strong> / Appendix I: EAS Well Spacing Application Forms (October 2011) • A-57

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!