01.12.2014 Views

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Long-Term <strong>Gas</strong> Removal Application (page 4)<br />

10. Attach a table in the required <strong>for</strong>mat (described in <strong>Directive</strong> <strong>065</strong>: <strong>Resources</strong> <strong>Applications</strong> <strong>for</strong> Conventional <strong>Oil</strong> <strong>and</strong> <strong>Gas</strong><br />

<strong>Reservoirs</strong>) of the l<strong>and</strong>s/zones that would supply the permit or amended permit, including<br />

• the legal description of all the l<strong>and</strong>s involved,<br />

• the zone or zones under the applicant's control <strong>for</strong> the l<strong>and</strong>s in question, <strong>and</strong><br />

• the working interest ownership under the applicant's control <strong>for</strong> the l<strong>and</strong>s/zones.<br />

11. Attach a summary of the total gas reserves volume associated with the l<strong>and</strong>s serving the proposed permit, together with a<br />

list of all commitments that would be served by the reserves portfolio involved, including the proposed permit <strong>and</strong> other<br />

permits (specify the number of each existing permit, as well as remaining authorized commitment), intra-Alberta<br />

commitments (such as industrial, commercial, or residential contracts or corporate warranties to other companies), <strong>and</strong><br />

any other commitments.<br />

Total gas reserves volume associated with the l<strong>and</strong>s serving the proposed permit: _________________________ m 3<br />

Commitments to be served by the reserves portfolio involved:<br />

Permit No. or other commitment (describe) Total volume of commitment (m 3 )<br />

___________________________________________________<br />

___________________________________________________<br />

___________________________________________________<br />

___________________________________________________<br />

___________________________________________________<br />

___________________________________________________<br />

___________________________________________________<br />

___________________________________________________<br />

___________________________________________________<br />

____________________________<br />

____________________________<br />

____________________________<br />

____________________________<br />

____________________________<br />

____________________________<br />

____________________________<br />

____________________________<br />

____________________________<br />

Reporting Requirements Associated with a <strong>Gas</strong> Removal Permit<br />

A monthly gas removal permit statement must be completed <strong>for</strong> each permit <strong>and</strong> filed electronically with the ERCB by midnight<br />

on the 28th day of the month following the data month. The data month is the month when the gas is delivered. If the 28th is<br />

not a business day, the deadline falls on the next business day. The <strong>for</strong>m must be completed <strong>and</strong> filed <strong>for</strong> each permit even if<br />

no gas has been removed. Detailed reporting instructions are set out in Bulletin 2006-42: <strong>Gas</strong> Removal Data System<br />

Compliance Process, available on the ERCB Web site www.ercb.ca. Questions on reporting may be directed to the ERCB<br />

Economics Group at 403-297-5836.<br />

RES - GR - 2 – 2010-04<br />

Energy <strong>Resources</strong> Conservation Board, Suite 1000, 250 – 5 Street SW Calgary, Alberta T2P 0R4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!