01.12.2014 Views

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Requirements<br />

3) If requesting an extension to the three-month<br />

period <strong>for</strong> <strong>Directive</strong> 051 submission date,<br />

provide<br />

a) the proposed submission date, <strong>and</strong><br />

b) the reason(s) <strong>for</strong> needing the submission<br />

date extension.<br />

Comments<br />

Disposal well approvals <strong>for</strong> non-H 2 S gas<br />

injection issued in advance of <strong>Directive</strong> 051<br />

requirements being met will contain a clause<br />

requiring that the <strong>Directive</strong> 051 in<strong>for</strong>mation<br />

be submitted within three months of the<br />

approval’s issue date. If three months is<br />

not sufficient time to meet the <strong>Directive</strong> 051<br />

requirements, you must request an extension.<br />

If the <strong>Directive</strong> 051 requirements are not<br />

submitted within the three months or other<br />

approved time frame, ERCB staff will<br />

rescind the approval or portion pertaining to<br />

the subject wells. For more in<strong>for</strong>mation on<br />

submission requirements <strong>and</strong> the disposal<br />

approval process, see General Bulletin (GB)<br />

2000-8.<br />

4) When submitting <strong>Directive</strong> 051 in<strong>for</strong>mation<br />

after the approval has been issued, provide<br />

the field <strong>and</strong> pool name, the disposal scheme<br />

approval number, <strong>and</strong> the well location(s).<br />

5) Provide the following in<strong>for</strong>mation <strong>for</strong> either<br />

1) all the wells in the pool if disposal is into<br />

a depleted hydrocarbon pool or 2) all the<br />

wells within the disposal well section <strong>and</strong><br />

adjoining sections if disposal is into an<br />

aquifer system:<br />

There must be hydraulic isolation between<br />

the disposal fluid <strong>and</strong> any other wellbores<br />

drilled into or through the disposal zone.<br />

a) well location,<br />

b) status of well,<br />

c) completion intervals, <strong>and</strong><br />

d) all casing in<strong>for</strong>mation.<br />

4-14 • ERCB <strong>Directive</strong> <strong>065</strong>: <strong>Resources</strong> <strong>Applications</strong> / Acid <strong>Gas</strong> Disposal (October 2011)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!