Requirements<br />

d) a copy of an ERCB letter waiving the<br />

<strong>Directive</strong> 051 requirements.<br />

Comments<br />

going on injection in order to ensure that<br />

hydraulic isolation of the disposal interval<br />

exists at the wellbore <strong>and</strong> that the disposal<br />

fluid will enter the intended reservoir<br />

interval.<br />

The ERCB will permit injection of up to<br />

500 m 3 of water to obtain the required<br />

isolation logs.<br />

If you have met <strong>Directive</strong> 051 requirements<br />

<strong>for</strong> the proposed disposal wells, you must<br />

include the completion logs <strong>and</strong> associated<br />

discussions required by the directive. The<br />

ERCB will then h<strong>and</strong>le all matters pertaining<br />

to the completion approval(s) concurrently<br />

with the scheme approval.<br />

If you have not met <strong>Directive</strong> 051<br />

requirements, disposal may NOT<br />

commence until you have received a letter<br />

from the ERCB stating that the <strong>Directive</strong><br />

051 requirements have been met <strong>and</strong><br />

injection can commence.<br />

3) If you are requesting an extension to the<br />

three-month <strong>Directive</strong> 051 submission date,<br />

provide<br />

a) the proposed submission date, <strong>and</strong><br />

b) the reasons(s) <strong>for</strong> needing the<br />

submission date extension.<br />

Disposal well approvals issued in advance of<br />

<strong>Directive</strong> 051 requirements being met will<br />

contain a clause requiring that the <strong>Directive</strong><br />

051 in<strong>for</strong>mation be submitted within three<br />

months of the approval’s issue date. If three<br />

months is not sufficient time to meet the<br />

<strong>Directive</strong> 051 requirements, you must request<br />

an extension.<br />

4) When submitting <strong>Directive</strong> 051 in<strong>for</strong>mation<br />

after the approval has been issued, you<br />

should provide the field <strong>and</strong> pool name, the<br />

disposal scheme approval number, <strong>and</strong> the<br />

well location(s).<br />

If the <strong>Directive</strong> 051 requirements are not<br />

submitted within the three months or other<br />

approved timeframe, ERCB staff will rescind<br />

the approval or portion pertaining to the<br />

subject wells. For more in<strong>for</strong>mation on<br />

submission requirements <strong>and</strong> the disposal<br />

approval process, see ERCB General Bulletin<br />

(GB) 2000-8.<br />

4-6 • ERCB <strong>Directive</strong> <strong>065</strong>: <strong>Resources</strong> <strong>Applications</strong> / Class I-IV Disposal (October 2011)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!