01.12.2014 Views

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Requirements<br />

18) Identification of the existing or proposed<br />

enhanced recovery scheme.<br />

19) For any oil pools involved,<br />

a) confirmation that the oil pools have a<br />

common rate control or, alternatively, a<br />

separate application requesting a change<br />

in rate control has been submitted to the<br />

ERCB,<br />

b) if there is associated gas, confirmation<br />

that approval of concurrent production<br />

has been obtained or that a separate<br />

application requesting concurrent<br />

production approval has been submitted<br />

to the ERCB,<br />

c) a discussion respecting whether the oil<br />

pool involved contains or has potential<br />

<strong>for</strong> an enhanced oil recovery scheme <strong>and</strong>,<br />

if so, the possible effect of approval <strong>for</strong><br />

commingling of production on the<br />

effectiveness of such a scheme, <strong>and</strong><br />

d) an evaluation of the oil <strong>and</strong> gas reserves<br />

<strong>for</strong> each pool, including<br />

i) an estimate of the initial oil volume<br />

<strong>and</strong> gas volume in place,<br />

ii) an estimate of the oil <strong>and</strong> gas recovery<br />

factors,<br />

iii) a description of the methods used in<br />

determining (i) <strong>and</strong> (ii) above (e.g.,<br />

material balance, volumetric analysis,<br />

model study, a comparison of analog<br />

pools), <strong>and</strong><br />

iv) the supporting data used in<br />

determining (i) <strong>and</strong> (ii) above <strong>and</strong> the<br />

sources of the data (e.g.,<br />

pressure/volume/temperature [PVT]<br />

properties <strong>and</strong> source, pressure data<br />

<strong>and</strong> source).<br />

20) For any gas pool located in an oil s<strong>and</strong>s<br />

area,<br />

a) confirmation that there is no shut-in<br />

order <strong>for</strong> the subject well <strong>and</strong> zones<br />

arising from a gas/bitumen proceeding<br />

<strong>and</strong> that the wells <strong>and</strong> zones are not<br />

subject to any upcoming gas/bitumen<br />

proceeding,<br />

b) a statement that the well involved<br />

would be producing in accordance with<br />

ERCB Interim <strong>Directive</strong> (ID) 99-1, <strong>and</strong><br />

Comments<br />

This must include the approval number of<br />

any existing scheme or the application<br />

number or details of a proposed scheme.<br />

Production from oil pools with different rate<br />

controls may not be commingled.<br />

Separate applications must be submitted <strong>for</strong><br />

commingling approval <strong>and</strong> <strong>for</strong> concurrent<br />

production <strong>and</strong> good production practice.<br />

Commingling of production in the wellbore<br />

might not be an optimum strategy when it<br />

may hamper the effectiveness of an enhanced<br />

recovery scheme.<br />

For wells drilled <strong>and</strong>/or completed in a<br />

defined oil s<strong>and</strong>s strata after July 1, 1998,<br />

you must submit an application <strong>and</strong> obtain<br />

approval from the ERCB be<strong>for</strong>e any gas,<br />

other than solution gas, may be produced.<br />

In an area where pool per<strong>for</strong>mance <strong>and</strong><br />

pressure data are scarce (e.g., low drilling<br />

density, limited production), the ongoing<br />

collection of zonal data may prove crucial to<br />

future decisions on gas production <strong>and</strong> to the<br />

re-evaluation of past gas production<br />

ERCB <strong>Directive</strong> <strong>065</strong>: <strong>Resources</strong> <strong>Applications</strong> / Commingled Production (October 2011) • 3-29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!