Directive 065: Resources Applications for Oil and Gas Reservoirs ...
Directive 065: Resources Applications for Oil and Gas Reservoirs ...
Directive 065: Resources Applications for Oil and Gas Reservoirs ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Requirements<br />
18) Identification of the existing or proposed<br />
enhanced recovery scheme.<br />
19) For any oil pools involved,<br />
a) confirmation that the oil pools have a<br />
common rate control or, alternatively, a<br />
separate application requesting a change<br />
in rate control has been submitted to the<br />
ERCB,<br />
b) if there is associated gas, confirmation<br />
that approval of concurrent production<br />
has been obtained or that a separate<br />
application requesting concurrent<br />
production approval has been submitted<br />
to the ERCB,<br />
c) a discussion respecting whether the oil<br />
pool involved contains or has potential<br />
<strong>for</strong> an enhanced oil recovery scheme <strong>and</strong>,<br />
if so, the possible effect of approval <strong>for</strong><br />
commingling of production on the<br />
effectiveness of such a scheme, <strong>and</strong><br />
d) an evaluation of the oil <strong>and</strong> gas reserves<br />
<strong>for</strong> each pool, including<br />
i) an estimate of the initial oil volume<br />
<strong>and</strong> gas volume in place,<br />
ii) an estimate of the oil <strong>and</strong> gas recovery<br />
factors,<br />
iii) a description of the methods used in<br />
determining (i) <strong>and</strong> (ii) above (e.g.,<br />
material balance, volumetric analysis,<br />
model study, a comparison of analog<br />
pools), <strong>and</strong><br />
iv) the supporting data used in<br />
determining (i) <strong>and</strong> (ii) above <strong>and</strong> the<br />
sources of the data (e.g.,<br />
pressure/volume/temperature [PVT]<br />
properties <strong>and</strong> source, pressure data<br />
<strong>and</strong> source).<br />
20) For any gas pool located in an oil s<strong>and</strong>s<br />
area,<br />
a) confirmation that there is no shut-in<br />
order <strong>for</strong> the subject well <strong>and</strong> zones<br />
arising from a gas/bitumen proceeding<br />
<strong>and</strong> that the wells <strong>and</strong> zones are not<br />
subject to any upcoming gas/bitumen<br />
proceeding,<br />
b) a statement that the well involved<br />
would be producing in accordance with<br />
ERCB Interim <strong>Directive</strong> (ID) 99-1, <strong>and</strong><br />
Comments<br />
This must include the approval number of<br />
any existing scheme or the application<br />
number or details of a proposed scheme.<br />
Production from oil pools with different rate<br />
controls may not be commingled.<br />
Separate applications must be submitted <strong>for</strong><br />
commingling approval <strong>and</strong> <strong>for</strong> concurrent<br />
production <strong>and</strong> good production practice.<br />
Commingling of production in the wellbore<br />
might not be an optimum strategy when it<br />
may hamper the effectiveness of an enhanced<br />
recovery scheme.<br />
For wells drilled <strong>and</strong>/or completed in a<br />
defined oil s<strong>and</strong>s strata after July 1, 1998,<br />
you must submit an application <strong>and</strong> obtain<br />
approval from the ERCB be<strong>for</strong>e any gas,<br />
other than solution gas, may be produced.<br />
In an area where pool per<strong>for</strong>mance <strong>and</strong><br />
pressure data are scarce (e.g., low drilling<br />
density, limited production), the ongoing<br />
collection of zonal data may prove crucial to<br />
future decisions on gas production <strong>and</strong> to the<br />
re-evaluation of past gas production<br />
ERCB <strong>Directive</strong> <strong>065</strong>: <strong>Resources</strong> <strong>Applications</strong> / Commingled Production (October 2011) • 3-29