01.12.2014 Views

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Data requirements <strong>for</strong> wells with production commingled in the wellbore under the DE<br />

process include those set out in Sections 11.005, 11.070, 11.102, <strong>and</strong> 11.140 of the OGCR<br />

<strong>and</strong> in <strong>Directive</strong> 040: Pressure <strong>and</strong> Deliverability Testing <strong>Oil</strong> <strong>and</strong> <strong>Gas</strong> Wells—Minimum<br />

Requirements <strong>and</strong> Recommended Practices.<br />

The data collection requirements <strong>for</strong> gas production from coals <strong>and</strong> shales are set out in<br />

Sections 11.005, 11.040, 11.070, 11.102, 11.140, <strong>and</strong> 11.145 of the OGCR <strong>and</strong> in <strong>Directive</strong><br />

040. Section 7.025 of the OGCR requires control wells <strong>for</strong> the production of coalbed methane<br />

(CBM) <strong>and</strong> shale gas. These control well requirements must be met by all licensees that have<br />

gas production from coals or shales.<br />

3.1.5.1 Requirements <strong>for</strong> Commingling of <strong>Gas</strong> Production in a DE<br />

The following are the specific requirements set out in Section 3.051(1) of the OGCR that<br />

must be met be<strong>for</strong>e nonassociated gas production may be undertaken without segregation in<br />

the wellbore under the DE process:<br />

1) There are no completions above or below the stratigraphic interval of the DE.<br />

2) Anticipated or actual water production is less than 5.0 m 3 /month if there are completions<br />

above the base of the BGWP.<br />

3) The top of the completions is more than 25 m below the base of any water well within<br />

600 m of the producing well.<br />

4) There is no H 2 S in the production stream.<br />

5) The licensee has resolved any concerns of lessors or lessees of the mineral rights whose<br />

rights may be directly <strong>and</strong> adversely affected by the unsegregated production.<br />

6) The reservoir pressure of any interval completed <strong>for</strong> production does not exceed 90 per<br />

cent of the fracture pressure of any other interval completed <strong>for</strong> production.<br />

7) There is no production of gas associated with an oil accumulation.<br />

Requirements respecting notification of commingling in accordance with the DE process are<br />

included in Section 3.1.3.5. For other additional in<strong>for</strong>mation, refer to the decision tree in<br />

Figure 3.2 <strong>and</strong> the explanatory notes in Section 3.1.7.<br />

3-8 • ERCB <strong>Directive</strong> <strong>065</strong>: <strong>Resources</strong> <strong>Applications</strong> / Commingled Production (October 2011)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!