01.12.2014 Views

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Requirements<br />

Comments<br />

iii) completions <strong>and</strong> treatments to the<br />

wellbore(s), with dates,<br />

iv) cumulative production,<br />

v) finished drilling date <strong>and</strong> kelly<br />

bushing (KB) elevation, <strong>and</strong><br />

vi) the scale of the log readings, <strong>and</strong><br />

d) a tabulation of the interpreted net pay,<br />

porosity, <strong>and</strong> water saturation <strong>for</strong> each<br />

well in the pool, along with the cutoffs,<br />

methodology, <strong>for</strong>mulas, <strong>and</strong> constants<br />

used.<br />

These data assist the ERCB to assess your<br />

mapping <strong>and</strong> reserves calculations requested<br />

in the following item. In addition, these data<br />

may be used to allocate production (see<br />

item 14).<br />

9) An evaluation of the oil <strong>and</strong> gas reserves <strong>for</strong><br />

the pool <strong>and</strong> <strong>for</strong> your l<strong>and</strong>s, including<br />

The reserves estimates confirm that there are<br />

reserves available <strong>for</strong> production.<br />

a) an estimate of the initial oil volume <strong>and</strong><br />

gas volume in place,<br />

b) an estimate of the oil <strong>and</strong> gas recovery<br />

factors,<br />

c) a description of the methods used in<br />

determining (a) <strong>and</strong> (b) above (e.g.,<br />

material balance, volumetric analysis,<br />

model study, a comparison of analog<br />

pools), <strong>and</strong><br />

d) the supporting data used in determining<br />

(a) <strong>and</strong> (b) above <strong>and</strong> the sources of the<br />

data (i.e., pressure/volume/temperature<br />

[PVT] properties <strong>and</strong> source, pressure<br />

data <strong>and</strong> source).<br />

You should provide all data used in obtaining<br />

the reserves estimates so that your analysis<br />

can be duplicated.<br />

10) A discussion of drainage, including<br />

a) evidence showing that the reserves<br />

underlying your l<strong>and</strong>s have been drained<br />

subsequent to the completion of your<br />

well in the pool, <strong>and</strong><br />

Drainage is not a prerequisite <strong>for</strong> the issuance<br />

of a common carrier order but could be one<br />

factor in determining the need <strong>for</strong> an order.<br />

In addition, the ERCB would consider the<br />

extent to which drainage has occurred in<br />

evaluating what the effective date of the<br />

order should be.<br />

ERCB <strong>Directive</strong> <strong>065</strong>: <strong>Resources</strong> <strong>Applications</strong> / Common Carrier (October 2011) • 1-17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!