7.4.1 Quick Application Path<br />

Well spacing applications that meet all of the baseline criteria outlined below <strong>and</strong> clearly<br />

meet all <strong>Directive</strong> <strong>065</strong> requirements qualify to be processed in an expedited manner using a<br />

quick application path. The review emphasis <strong>for</strong> quick path applications shifts from the<br />

reservoir’s behaviour in the application area to behaviour in the adjacent previously approved<br />

<strong>and</strong> developed DSU.<br />

Minimum Baseline Criteria <strong>for</strong> the Quick Application Processing Path<br />

1) Each applied-<strong>for</strong> holding within the application area must be adjacent to an existing<br />

approval. See Figure 7.5.<br />

2) Each DSU in the area of application must be adjacent to a DSU that has approved spacing<br />

<strong>and</strong> proven production in<strong>for</strong>mation from a well in the applied-<strong>for</strong> <strong>for</strong>mation(s).<br />

3) The applied-<strong>for</strong> well density must be less than or equal to the approved well density.<br />

4) Proposed well densities must be no more than two wells per pool per quarter section <strong>for</strong><br />

oil <strong>and</strong> four wells per pool per section <strong>for</strong> gas.<br />

Figure 7.5. Quick application path<br />

5) St<strong>and</strong>ard buffer zones must be proposed.<br />

<strong>Applications</strong> that are filed in the quick application pathway but that do not meet all the<br />

baseline criteria <strong>for</strong> the quick application path will be closed.<br />

7.4.2 St<strong>and</strong>ard Application Path<br />

If the application does not meet the quick application path criteria, it must meet all of the<br />

following minimum baseline criteria to be processed on the st<strong>and</strong>ard application path:<br />

Minimum Baseline Criteria <strong>for</strong> the St<strong>and</strong>ard Application Processing Path<br />

1) Any part of a holding must be within three st<strong>and</strong>ard DSUs of an existing approval. See<br />

Figure 7.6.<br />

2) There must be proven production in<strong>for</strong>mation from the applied-<strong>for</strong> <strong>for</strong>mation(s)/pool(s)<br />

in each proposed holding/unit.<br />

7-14 • ERCB <strong>Directive</strong> <strong>065</strong>: <strong>Resources</strong> <strong>Applications</strong> / Application <strong>for</strong> Special Well Spacing (October 2011)