Requirements<br />

Comments<br />

c) the effect of increased production on<br />

liquid coning, terminal fluid interface<br />

position, <strong>and</strong> interpool interference,<br />

d) the effect on the rates of production of<br />

any oil, condensate, or pentanes plus<br />

that may be present in the pool if the<br />

application is granted,<br />

e) appropriate economic analyses, <strong>and</strong><br />

f) pertinent reservoir studies. The in<strong>for</strong>mation <strong>for</strong> 8(f) is required only<br />

when the allowable was originally assigned<br />

<strong>for</strong> conservation reasons or when pool<br />

delineation is an issue.<br />

Notification—Equity<br />

The ERCB requires the in<strong>for</strong>mation described below to establish who potentially<br />

adversely affected parties are <strong>and</strong> whether equity issues may exist. You are encouraged to<br />

carry out the notification described here. The ERCB reserves the right to advertise any<br />

application <strong>for</strong> its own purposes.<br />

Requirements<br />

1) A map showing<br />

a) the zero edge of the pool,<br />

b) the status of each well completed in the<br />

pool, <strong>and</strong><br />

c) the licensees in the pool <strong>and</strong> <strong>for</strong> 1600 m<br />

surrounding the pool that contains the<br />

well <strong>for</strong> which a change to allowable is<br />

requested.<br />

Comments<br />

This in<strong>for</strong>mation generally is required only<br />

when the allowable originally was assigned<br />

<strong>for</strong> conservation reasons or when pool<br />

delineation is an issue.<br />

Generally, only when allowables have been<br />

set <strong>for</strong> an entire pool <strong>for</strong> conservation<br />

reasons is the full level of notification<br />

referred to in 1(c) required. The 1600 m<br />

buffer around the pool is included to ensure<br />

that no offset licensees have a different<br />

interpretation of the pool. In most cases,<br />

affected parties are those considered by the<br />

ERCB to have a productive well in the same<br />

geological pool in a drilling spacing unit<br />

(DSU) immediately offsetting the subject<br />

well.<br />

If the allowable was established because the<br />

subject well is off target, generally only<br />

wells in the same geological pool that the<br />

subject well is off target towards are<br />

3-42 • ERCB <strong>Directive</strong> <strong>065</strong>: <strong>Resources</strong> <strong>Applications</strong> / <strong>Gas</strong> Allowable (October 2011)