01.12.2014 Views

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

compulsory pooling<br />

2) Conservation: enhanced recovery scheme (gas cycling, waterflood, immiscible gas<br />

flood, miscible flood), concurrent production, <strong>and</strong> pool delineation <strong>and</strong> ultimate reserves<br />

3) Production Control: commingled production, good production practice (primary<br />

depletion pools), gas-oil ratio penalty relief, special maximum rate limitation, <strong>and</strong> gas<br />

allowable<br />

4) Disposal/Storage: disposal (water <strong>and</strong> waste), acid gas disposal, <strong>and</strong> underground gas<br />

storage<br />

5) Corporate Changes: change in name of the holder of an ERCB approval <strong>and</strong> change in<br />

holder of an ERCB approval<br />

6) <strong>Gas</strong> <strong>and</strong> Ethane Removal: short <strong>and</strong> long-term natural gas removal, short-term ethane<br />

removal.<br />

7) Special Well Spacing: holdings or units, special drilling spacing units, rescind a special<br />

drilling spacing unit, rescind a holding or unit, <strong>and</strong> modify spacing.<br />

The appendices include<br />

• list of references<br />

• notification templates<br />

• Application <strong>for</strong> <strong>Gas</strong>-<strong>Oil</strong> Ratio Penalty Relief (Form O-33)<br />

• Transfer of Approval <strong>for</strong>m<br />

• list of ERCB contacts<br />

• Enhanced Recovery Scheme application <strong>for</strong>m<br />

• gas <strong>and</strong> ethane removal application <strong>for</strong>ms<br />

• <strong>Gas</strong> Reserves Data Sheet<br />

• EAS well spacing application <strong>for</strong>ms <strong>and</strong> explanatory notes<br />

• special well spacing notification templates<br />

• special well spacing attachment examples<br />

• st<strong>and</strong>ard target areas <strong>and</strong> buffer zones<br />

• target area descriptions <strong>for</strong> special well spacing be<strong>for</strong>e October 6, 2011<br />

You are strongly encouraged to become familiar with the references listed in Appendix A<br />

be<strong>for</strong>e completing your applications.<br />

What’s New in <strong>Directive</strong> <strong>065</strong><br />

In this October 2011 edition of <strong>Directive</strong> <strong>065</strong>:<br />

• Section 1.5.2 has been amended to reflect how the ERCB currently processes applications<br />

<strong>for</strong> compulsory pooling orders<br />

• Unit 7: Application <strong>for</strong> Special Well Spacing, Section 7.2, has been updated to<br />

incorporate changes to the provincial well spacing framework <strong>for</strong> conventional <strong>and</strong><br />

unconventional oil <strong>and</strong> gas reservoirs, as announced in Bulletin 2011-29: Changes to the<br />

Province-Wide Framework <strong>for</strong> Well Spacing <strong>for</strong> Conventional <strong>and</strong> Unconventional <strong>Oil</strong><br />

<strong>and</strong> <strong>Gas</strong> <strong>Reservoirs</strong>, <strong>and</strong> detail revisions to the application processes<br />

• Multiple references to the OGCR have been updated in response to the provincial<br />

framework changes<br />

• Appendix M <strong>and</strong> N on special well spacing have been added to further assist applicants in<br />

6 • ERCB <strong>Directive</strong> <strong>065</strong>: <strong>Resources</strong> <strong>Applications</strong> / How to Use This <strong>Directive</strong> (October 2011)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!