Directive 065: Resources Applications for Oil and Gas Reservoirs ...
Directive 065: Resources Applications for Oil and Gas Reservoirs ...
Directive 065: Resources Applications for Oil and Gas Reservoirs ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Requirements<br />
5) A map showing the location of the subject<br />
pool, processing plant, any alternative<br />
facilities, <strong>and</strong> your production facilities.<br />
Comments<br />
6) A statement specifying the operator <strong>and</strong><br />
ownership of the processing plant.<br />
7) A discussion of<br />
a) the total processing capacity of the plant,<br />
b) the volumes of gas from the pool or<br />
pools to be subject to the proposed<br />
common processor declaration <strong>and</strong> from<br />
other pools currently processed at the<br />
subject plant, <strong>and</strong><br />
c) the processing capacity available to you<br />
in the plant.<br />
8) An analysis of the composition of the gas to<br />
be processed under the common processor<br />
declaration, together with a discussion as to<br />
the capability of the plant to process the<br />
subject gas.<br />
9) Your geological interpretation of the pool<br />
involved, including<br />
a) a net pay isopach map of the pool,<br />
including both oil <strong>and</strong> gas if there is an<br />
associated pool,<br />
The net pay map should show the entire pool<br />
<strong>and</strong> illustrate wells outside the pool that<br />
control the edges of the pool.<br />
b) where pool delineation or fluid interfaces<br />
are based on structural interpretation, a<br />
structure contour map of the pool <strong>and</strong><br />
offsetting area,<br />
c) an interpreted <strong>and</strong> annotated log crosssection<br />
or representative well log(s)<br />
showing<br />
i) stratigraphic interpretation of the<br />
zone(s) of interest,<br />
ii) interpretation of the fluid interfaces<br />
present,<br />
If there is a dispute among the parties<br />
involved regarding the delineation of the<br />
pool(s) in question, you should include an<br />
annotated cross-section in the application; if<br />
there is no dispute respecting this issue, an<br />
annotated representative well log is<br />
sufficient.<br />
iii) completions <strong>and</strong> treatments to the<br />
1-24 • ERCB <strong>Directive</strong> <strong>065</strong>: <strong>Resources</strong> <strong>Applications</strong> / Common Processor (October 2011)