01.12.2014 Views

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

Directive 065: Resources Applications for Oil and Gas Reservoirs ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• 1 Section<br />

• Limited by Buffer Distance<br />

• Limited by Interwell <strong>and</strong> Buffer Distances<br />

Note that typically well density areas are equivalent to the size of the st<strong>and</strong>ard DSU (e.g., if the<br />

st<strong>and</strong>ard DSU is 1 section, the well density area would typically be per pool per 1 section).<br />

10) The st<strong>and</strong>ard buffer zone distance <strong>and</strong> orientation <strong>for</strong> this area of the province is:<br />

This is populated based on the spacing application type (Spacing: <strong>Gas</strong> or Spacing: <strong>Oil</strong>) selected<br />

on Schedule 1 <strong>and</strong> the area of application selected on the Well Spacing Map.<br />

The st<strong>and</strong>ard buffer zones within the province are as indicated in the table below.<br />

Schedule Holding or unit St<strong>and</strong>ard buffer zone<br />

13A <strong>Gas</strong> 150 m on south <strong>and</strong> west boundaries<br />

of a holding or unit<br />

All Alberta<br />

Except 13A<br />

<strong>Gas</strong><br />

150 m on all boundaries of a holding<br />

or unit<br />

All Alberta <strong>Oil</strong> 100 m on all boundaries of a holding<br />

or unit<br />

10a) Do you want to proceed with the st<strong>and</strong>ard buffer zone distance <strong>and</strong> orientation?<br />

Select YES if you are proposing the st<strong>and</strong>ard buffer zone as shown in the table in question 10.<br />

Select NO to request a nonst<strong>and</strong>ard buffer zone. You must enter the buffer zone distance <strong>and</strong><br />

orientation in questions 10b <strong>and</strong> 10c <strong>and</strong> provide additional technical in<strong>for</strong>mation supporting the<br />

request.<br />

10b) If NO, enter the buffer zone distance.<br />

Enter the buffer zone distance from the boundaries of each holding/unit in metres.<br />

10c) Enter the buffer orientation.<br />

Select the boundaries of the holding/unit that the buffer zone distance applies to.<br />

11) Are you requesting an interwell distance?<br />

If you select YES, enter the requested interwell distance in question 11a.<br />

Note that an interwell distance is not required <strong>for</strong> a holding/unit spacing application.<br />

11a) If YES, enter the interwell distance.<br />

ERCB <strong>Directive</strong> <strong>065</strong>: <strong>Resources</strong> <strong>Applications</strong> / Appendix I: EAS Well Spacing Application Forms (October 2011) • A-41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!