If it is anticipated that water volumes equal to or greater than 5 m 3 /well/month could be<br />
produced from any or all intervals in the well that has per<strong>for</strong>ations above the BGWP, a<br />
licensee may not commingle production using the DE or SD process.<br />
If an existing well that is to be recompleted <strong>for</strong> commingled production has produced greater<br />
than 5 m 3 /well/month of water from the well in any of the last 12 months, a licensee may not<br />
commingle production using the DE or SD process.<br />
If the licensee wishes to commingle production in this circumstance, an application in<br />
accordance with Section 3.1.8 of <strong>Directive</strong> <strong>065</strong> must be submitted. The application must<br />
provide a case that water produced with commingled production will not contaminate<br />
groundwater or adversely impact the recovery of gas from coals. Licensees should note that<br />
commingling of production in wells with completions above the BGWP that have actual or<br />
anticipated water production equal to or greater than 5 m 3 /month conflicts with <strong>Directive</strong> 044.<br />
Licensees must also ensure that operations comply with the AENV Water Act, taking<br />
particular note that non-saline water may not be produced without a groundwater diversion<br />
permit, non-saline aquifers may not be mixed, <strong>and</strong> saline <strong>and</strong> non-saline aquifers may not be<br />
mixed.<br />
4. Are there any water wells within a 600 m radius with a total depth less than 25 m from the<br />
top of the per<strong>for</strong>ations of the well proposed <strong>for</strong> commingling?<br />
This requirement has consideration <strong>for</strong> <strong>Directive</strong> 027: Shallow Fracturing Operations—<br />
Interim Controls, Restricted Operations, <strong>and</strong> Technical Review <strong>and</strong> <strong>for</strong> AENV’s St<strong>and</strong>ard <strong>for</strong><br />
Baseline Water—Well Testing <strong>for</strong> Coalbed Methane/Natural <strong>Gas</strong> in Coal Operations, April<br />
2006. If the situation as illustrated below exists, the licensee may not commingle production<br />
using the DE or SD process. If the licensee wishes to commingle production in this<br />
circumstance, an application in accordance with Section 3.1.8 of <strong>Directive</strong> <strong>065</strong> must be<br />
submitted.<br />