If any gas-cap gas is or will be produced from the subject pool during the operations of the<br />

ER scheme, provide a discussion on the potential <strong>for</strong> fluid migration from the scheme into the<br />

gas-cap <strong>and</strong> pressure depletion in the scheme due to gas-cap gas production. If potential <strong>for</strong><br />

fluid migration or pressure depletion is identified, the discussion should include the impact on<br />

ultimate hydrocarbon recovery.<br />

NO means either that there is no associated gas cap in the pool or that the associated gas cap<br />

will not be produced during the period that the ER scheme is operational.<br />

20) Is gas-cap gas currently being produced from the scheme area?<br />

YES means that an associated gas cap is present in the pool <strong>and</strong> this gas is currently being<br />

produced from the scheme.<br />

NO means that an associated gas cap is present in the pool but this gas is not currently being<br />

produced from the scheme.<br />

20a) Has the appropriate concurrent production (CCP) approval been issued?<br />

If Question 20 is answered yes, gas-cap gas is currently being produced from the scheme area<br />

<strong>and</strong> this question must be answered.<br />

YES means that the appropriate <strong>for</strong>m of concurrent production that encompasses the current<br />

gas-cap gas production has been approved by the ERCB. The CCP approval details are listed<br />

in the ERCB’s MRL Order.<br />

NO means that the current gas-cap gas production has not been approved by the ERCB.<br />

20b) An application <strong>for</strong> CCP is required. Has an application <strong>for</strong> CCP been registered?<br />

If Question 20a is answered no, the current gas-cap gas production has not been approved by<br />

the ERCB <strong>and</strong> this question must be answered.<br />

YES means that an application <strong>for</strong> CCP has been registered with the ERCB.<br />

NO means that an application <strong>for</strong> CCP has not yet been registered with the ERCB.<br />

Unauthorized CCP is not permitted; an application <strong>for</strong> CCP is required pursuant to Section<br />

39(1)(f) of the <strong>Oil</strong> <strong>and</strong> <strong>Gas</strong> Conservation Act <strong>and</strong> Section 2.4 of this directive.<br />

20c) If yes, provide the CCP application number.<br />

If Question 20b is answered yes, an application <strong>for</strong> CPP has been registered with the ERCB<br />

<strong>and</strong> this question must be answered.<br />

If an application <strong>for</strong> CCP has been registered, enter the ERCB application number.<br />

In<strong>for</strong>mation details on applications registered with the ERCB are on the ERCB’s Web site.<br />

C) Explanatory Notes <strong>for</strong> ER Scheme Application Attachments<br />

Application Attachment<br />

A text attachment providing a description of the proposed scheme that includes:<br />

1) the proposed injection pattern,<br />

2-14 • ERCB <strong>Directive</strong> <strong>065</strong>: <strong>Resources</strong> <strong>Applications</strong> / Enhanced Recovery Scheme (October 2011)