Glossary<br />

synergy — The concept that <strong>the</strong> whole is equal<br />

to more than <strong>the</strong> sum of its parts.<br />

team contract — A document created to help<br />

promote teamwork and clarify team<br />

communications.<br />

template — A file with a preset <strong>for</strong>mat that<br />

serves as a starting point <strong>for</strong> creating various<br />

documents so that <strong>the</strong> <strong>for</strong>mat and structure do<br />

not have to be re-created.<br />

Theory of Constraints (TOC) — A management<br />

philosophy that states that any complex<br />

system at any point in time often has only one<br />

aspect or constraint that is limiting its ability<br />

to achieve more of its goal.<br />

three-point estimate — An estimate that<br />

includes an optimistic, most likely, and pessimistic<br />

estimate.<br />

time-and-material contract — A type of contract<br />

that is a hybrid of both a fixed-price and<br />

cost-reimbursable contract.<br />

tracking Gantt chart — A Gantt chart that<br />

compares planned and actual project schedule<br />

in<strong>for</strong>mation.<br />

triggers — The indicators or symptoms of<br />

actual risk events.<br />

triple constraint — The balancing of scope,<br />

time, and cost goals.<br />

Tuckman model — A model that describes five<br />

stages of team development (<strong>for</strong>ming, storming,<br />

norming, per<strong>for</strong>ming, and adjourning).<br />

weighted scoring model — A technique that<br />

provides a systematic process <strong>for</strong> basing<br />

project selection on numerous criteria.<br />

withdrawal mode — The conflict-handling<br />

mode that involves retreating or withdrawing<br />

from an actual or potential disagreement.<br />

work breakdown structure (WBS) —A<br />

deliverable-oriented grouping of <strong>the</strong> work<br />

involved in a project that defines <strong>the</strong> total<br />

scope of <strong>the</strong> project.<br />

Copyright 2009 Cengage Learning. All Rights Reserved.<br />

May not be copied, scanned, or duplicated, in whole or in part.<br />

work breakdown structure (WBS) dictionary<br />

— A document that describes detailed in<strong>for</strong>mation<br />

about WBS tasks.<br />

work package — A task at <strong>the</strong> lowest level of<br />

<strong>the</strong> WBS.<br />

workarounds — The unplanned responses to<br />

risk events.