Licensed to:<br />

378<br />

Appendix A<br />

TIP<br />

5. Display <strong>the</strong> Indicators column. Click Insert on <strong>the</strong> Menu bar, and <strong>the</strong>n click<br />

Column. The Column Definition dialog box opens. Click <strong>the</strong> Field name list<br />

arrow, select Indicators, and <strong>the</strong>n click OK. The Indicators column is displayed,<br />

showing a check mark by completed tasks.<br />

6. Display a project summary task bar. Click Tools on <strong>the</strong> Menu bar, and<br />

<strong>the</strong>n click Options. The Options dialog box opens. Click <strong>the</strong> Show project<br />

summary task option in <strong>the</strong> lower right side of <strong>the</strong> dialog box, and <strong>the</strong>n click<br />

OK. The name of <strong>the</strong> file is now displayed in Row 0.<br />

7. Review changes in <strong>the</strong> Gantt chart. Move <strong>the</strong> split bar to <strong>the</strong> left to reveal more<br />

of <strong>the</strong> Gantt chart. Notice that <strong>the</strong> Gantt chart bars <strong>for</strong> completed tasks have<br />

changed. Gantt chart bars <strong>for</strong> completed tasks appear with a black line drawn<br />

through <strong>the</strong> middle. You can also see <strong>the</strong> project summary task bar as <strong>the</strong> first<br />

bar displayed.<br />

You can hide <strong>the</strong> Indicators column by dragging <strong>the</strong> right border of <strong>the</strong> column heading to <strong>the</strong> left.<br />

You can also view actual and baseline schedule in<strong>for</strong>mation more clearly with <strong>the</strong> Tracking<br />

Gantt view. See <strong>the</strong> main text or use <strong>the</strong> Help facility <strong>for</strong> descriptions of <strong>the</strong> symbols<br />

on a Tracking Gantt chart.<br />

To display <strong>the</strong> Tracking Gantt chart:<br />

1. View <strong>the</strong> Tracking Gantt chart. Click View on <strong>the</strong> Menu bar, and <strong>the</strong>n click<br />

Tracking Gantt. Alternatively, you can click <strong>the</strong> Tracking Gantt button on<br />

<strong>the</strong> View Bar, if it is displayed. Use <strong>the</strong> horizontal scroll bar in <strong>the</strong> Gantt chart<br />

window, if necessary, to see symbols on <strong>the</strong> Tracking Gantt chart.<br />

2. Display Gantt chart in<strong>for</strong>mation in months. Double-click <strong>the</strong> Zoom Out<br />

button to display in<strong>for</strong>mation in months. Your screen should resemble Figure<br />

A-52. Notice that <strong>the</strong> delay in this one task on <strong>the</strong> critical path has caused<br />

<strong>the</strong> planned completion date <strong>for</strong> <strong>the</strong> entire project to slip. Because <strong>the</strong><br />

Analysis task preceded o<strong>the</strong>rs on <strong>the</strong> critical path, such as Design, Implementation,<br />

and so on, <strong>the</strong>y were delayed in starting. A good project manager would<br />

take corrective action to make up <strong>for</strong> this lost time or renegotiate <strong>the</strong><br />

completion date.<br />

3. Save your file as a new file named tracking.mpp. Click File on <strong>the</strong> Menu bar,<br />

and <strong>the</strong>n click Save As. Name <strong>the</strong> file tracking, and <strong>the</strong>n click Save.<br />

Notice <strong>the</strong> additional in<strong>for</strong>mation available on <strong>the</strong> Tracking Gantt chart. Completed tasks<br />

have 100% by <strong>the</strong>ir symbols on <strong>the</strong> Tracking Gantt chart. Tasks that have not started yet display<br />

0%. Tasks in progress, such as Task 9, show <strong>the</strong> percentage of <strong>the</strong> work completed (31%<br />

in this example). The project summary task bar indicates that <strong>the</strong> entire project is 32%<br />

complete. Also, note that <strong>the</strong> project completion date has moved to 11/26 since several tasks<br />

depended on <strong>the</strong> completion of Task 10, which took longer than planned. Recall from <strong>the</strong> main<br />

text that a white diamond represents a slipped milestone. Viewing <strong>the</strong> Tracking Gantt chart<br />

allows you to easily see your schedule progress against <strong>the</strong> baseline plan.<br />

Copyright 2009 Cengage Learning. All Rights Reserved.<br />

May not be copied, scanned, or duplicated, in whole or in part.