TABLE A-1 Common <strong>Project</strong> 2007 Views<br />

Category of View View Name Description of View<br />

Graphical Gantt Chart Standard <strong>for</strong>mat <strong>for</strong> displaying project schedule in<strong>for</strong>mation<br />

that lists project tasks and <strong>the</strong>ir corresponding start and finish<br />

dates in a calendar <strong>for</strong>mat. Shows each task as a horizontal<br />

bar with <strong>the</strong> length and position corresponding to <strong>the</strong> timescale<br />

at <strong>the</strong> top of <strong>the</strong> Gantt chart.<br />

Task Sheet<br />

or Table<br />

Network<br />

Diagram<br />

Form Task Details<br />

Form<br />

Schematic display of <strong>the</strong> logical relationships or sequencing of<br />

project activities. Presents each task as a box with linking<br />

lines between tasks to show sequencing. Critical tasks appear<br />

in red.<br />

Entry Table Default table view showing columns <strong>for</strong> Task Name and<br />

Duration. By revealing more of <strong>the</strong> Entry table, you can enter<br />

start and end dates, predecessors, and resource names.<br />

Schedule Table Displays columns <strong>for</strong> Task Name, Start, Finish, Late Start,<br />

Late Finish, Free Slack, and Total Slack.<br />

Cost Table Displays columns <strong>for</strong> Task Name, Fixed Cost, Fixed Cost<br />

Accrual, Total Cost, Baseline, Variance, Actual, and<br />

Remaining.<br />

Tracking Table Displays columns <strong>for</strong> Task Name, Actual Start, Actual Finish,<br />

% Complete, Physical % Complete, Actual Duration, Remaining<br />

Duration, Actual Cost, and Actual Work.<br />

Earned Value Displays columns <strong>for</strong> Task Name, PV, EV, AC, SV, CV, EAC,<br />

BAC, and VAC. See <strong>the</strong> earned value section of this text <strong>for</strong><br />

descriptions of <strong>the</strong>se acronyms.<br />

Task Name<br />

Form<br />

Displays detailed in<strong>for</strong>mation about a single task in one<br />

window.<br />

Displays columns <strong>for</strong> Task Name, Resources, and Predecessors<br />

<strong>for</strong> a single task.<br />

Next, you will use <strong>the</strong> same file (finance.mpp) to access and explore some of <strong>the</strong> views<br />

available in <strong>Project</strong> 2007.<br />

To access and explore different views:<br />

1. Show all subtasks. Click <strong>the</strong> Show button on <strong>the</strong> toolbar, and <strong>the</strong>n<br />

click All Subtasks. Click <strong>the</strong> Task Name <strong>for</strong> Task 0, finance.<br />

2. Explore <strong>the</strong> Network Diagram view. Click <strong>the</strong> Network Diagram button on<br />

<strong>the</strong> View Bar, and <strong>the</strong>n click <strong>the</strong> Zoom Out button on <strong>the</strong> toolbar three<br />

times. Your screen should resemble Figure A-13.<br />

Copyright 2009 Cengage Learning. All Rights Reserved.<br />

May not be copied, scanned, or duplicated, in whole or in part.<br />

335<br />

Guide to Using Microsoft <strong>Project</strong> 2007