FIGURE A-42 Assign Resources Dialog Box<br />

TIP<br />

3. Assign Kathy to Task 2. Click Kathy in <strong>the</strong> Resource Name column of <strong>the</strong><br />

Assign Resources dialog box, and <strong>the</strong>n click Assign. Notice that <strong>the</strong> duration<br />

estimate <strong>for</strong> Task 2 remains at 2 hours, and Kathy’s name appears on <strong>the</strong> Gantt<br />

chart by <strong>the</strong> bar <strong>for</strong> Task 2.<br />

4. Assign John to Task 2. Click John in <strong>the</strong> Resource Name column of <strong>the</strong> Assign<br />

Resources dialog box, and <strong>the</strong>n click Assign. The duration <strong>for</strong> Task 2 changes<br />

to 1 hour, but you do not want this change to occur. Click Close in <strong>the</strong> Assign<br />

Resources dialog box.<br />

5. Clear <strong>the</strong> resource assignments. Right-click <strong>the</strong> Resource Names column <strong>for</strong><br />

Task 2, and <strong>the</strong>n select Clear Contents to remove <strong>the</strong> resource assignments.<br />

6. Reenter <strong>the</strong> duration <strong>for</strong> Task 2. Type 2h in <strong>the</strong> Duration column <strong>for</strong> Task 2<br />

and press Enter.<br />

<strong>Project</strong> 2007 includes a multiple-level undo feature, so you can click <strong>the</strong> Undo button on <strong>the</strong> standard<br />

toolbar several times to undo several steps in your file.<br />

Assigning Resources Using <strong>the</strong> Split Window and Resource Cost View<br />

Even though using <strong>the</strong> Assign Resources button seems simple, it is often better to use a split<br />

window and <strong>the</strong> Resource Cost view when assigning resources. When you assign resources<br />

using <strong>the</strong> split view, <strong>the</strong> durations of tasks will not automatically change when you assign<br />

more resources, and you have more control over how you enter in<strong>for</strong>mation. <strong>Project</strong> 2007<br />

Help offers more in<strong>for</strong>mation on different options <strong>for</strong> resource assignment.<br />

To assign both Kathy and John to attend <strong>the</strong> two-hour kickoff meeting:<br />

1. Split <strong>the</strong> window to reveal more in<strong>for</strong>mation. Click Window on <strong>the</strong> Menu bar,<br />

and <strong>the</strong>n click Split. The Gantt Chart view is displayed at <strong>the</strong> top of <strong>the</strong> screen<br />

and a resource in<strong>for</strong>mation table is displayed at <strong>the</strong> bottom of <strong>the</strong> screen.<br />

Copyright 2009 Cengage Learning. All Rights Reserved.<br />

May not be copied, scanned, or duplicated, in whole or in part.<br />

369<br />

Guide to Using Microsoft <strong>Project</strong> 2007