27.04.2015 Views

Bellingham Comments from Digital Recorder - EISs for the Proposed ...

Bellingham Comments from Digital Recorder - EISs for the Proposed ...

Bellingham Comments from Digital Recorder - EISs for the Proposed ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GATEWAY PACIFIC TERMINAL EIS SCOPING HEARING VOL. I<br />

COURT REPORTER: GWEN BRASS PROCEEDING DATE: October 27, 2012<br />

Page 67<br />

this place with remain if this project is built. There's<br />

indeed a culture here. It is unique, vibrant, and healthy.<br />

This proposed coal terminal will significantly impact this<br />

culture and <strong>the</strong>re<strong>for</strong>e should be included within <strong>the</strong> scope of<br />

<strong>the</strong> EIS.<br />

Thank you.<br />

MR. STURTEVANT: I would just remind everyone that if<br />

you're not able <strong>for</strong> whatever reason to finish your comments,<br />

that <strong>the</strong>re are comment <strong>for</strong>ms that can be completed, and <strong>the</strong>re's<br />

also an area <strong>for</strong> anyone who'd like to make a verbal comment<br />

individually that will be recorded outside <strong>the</strong> o<strong>the</strong>r open house<br />

area. Thank you.<br />

48, 49 and 50, please.<br />

THE SPEAKER: My name is Amy Mower. I live on Silver<br />

Lake Road, Maple Falls.<br />

Impacts of <strong>the</strong> proposed project will clearly affect<br />

<strong>the</strong> Washington coastal rail corridor, but if a decision is made<br />

after <strong>the</strong> completion of <strong>the</strong> EIS to move <strong>the</strong> rail corridor<br />

inland along Highway 9, those same impacts will affect any<br />

interior rail corridor and must also be scoped now, even if not<br />

currently included in <strong>the</strong> pending application.<br />

Please include <strong>the</strong> following studies in <strong>the</strong> EIS <strong>for</strong><br />

both <strong>the</strong> coastal rail corridor and <strong>the</strong> Highway 9 rail corridor.<br />

One, a health impact assessment as requested by <strong>the</strong><br />

Whatcom Docs.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!