07.06.2015 Views

F4200N Manual - Fisnar.fr

F4200N Manual - Fisnar.fr

F4200N Manual - Fisnar.fr

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>F4200N</strong> Operating <strong>Manual</strong><br />

Section 5: Point Type & Function Reference<br />

Part # 562187N<br />

Rev. C Jun 2011<br />

5.5 Z Clearance<br />

The purpose of the Z Clearance function is to cause the tip to raise high enough to clear<br />

all obstacles as it moves <strong>fr</strong>om one point to another. If there are no obstacles between any<br />

of the program points, a small Z Clearance value, such as 5 mm, can be used to minimize<br />

the program cycle time.<br />

Values for the Z Clearance are registered by pressing the SETUP key, then choosing Z<br />

Clearance. The Z Clearance value will be used by all points <strong>fr</strong>om that memory address<br />

forward until another Z Clearance value is found. Normally, a Z clearance instruction<br />

should be registered in the beginning of a program, at one of the first memory addresses.<br />

The Z Clearance value may be specified as a relative value or an absolute value. When<br />

specified as a relative value, it is the distance to rise relative to the taught point location.<br />

When it is specified as an absolute value, it is a distance <strong>fr</strong>om the Z-axis zero position,<br />

where the tip will rise to, regardless of the Z-axis value of the taught point location. For<br />

example:<br />

Z Clearance = 10 mm RELATIVE:<br />

Z = 0 mm<br />

10 mm<br />

10 mm<br />

- Page 75 - © 2011 <strong>Fisnar</strong> Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!