13.07.2015 Views

ICS-1000 Ion Chromatography System Operator's Manual

ICS-1000 Ion Chromatography System Operator's Manual

ICS-1000 Ion Chromatography System Operator's Manual

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5•Service5.5 Cleaning and Replacing the Pump Check ValvesA dirty check valve causes erratic flow rates and pressures. In addition, itmay cause the pump to lose prime and/or be difficult to reprime. If possible,replace dirty check valves. If new check valves are not available, follow theinstructions for cleaning.Replacing Check Valves1. Close the eluent valve from the <strong>ICS</strong>-<strong>1000</strong> Control Panel in Chromeleon.2. Turn off the main power switch, to ensure that you do not unintentionally startthe <strong>ICS</strong>-<strong>1000</strong>.3. To prevent contamination of pump parts, put on a pair of rubber gloves beforedisassembling the pump head.4. Disconnect the tube fittings from the inlet and outlet check valve assemblieson the primary pump head (see Figure 5-4).5. Use a 1/2-inch wrench to loosen both check valve assemblies. Remove thecheck valve assemblies from the pump head.Outlet CheckValveSecondaryPump HeadPrimaryPump HeadAcorn NutsInlet CheckValveFigure 5-4. Pump HeadsNOTEThe inlet check valve assembly housing has a 1/4-28 port.The outlet check valve assembly housing has a 10-32 port.Doc. 031879-01 3/03 5-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!