13.07.2015 Views

ICS-1000 Ion Chromatography System Operator's Manual

ICS-1000 Ion Chromatography System Operator's Manual

ICS-1000 Ion Chromatography System Operator's Manual

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>ICS</strong>-<strong>1000</strong> <strong>Ion</strong> <strong>Chromatography</strong> <strong>System</strong>6. If you are installing new cartridges(P/N 045994) in the existing check valvehousings, place the cartridge in the inletcheck valve housing with the double-holeend of the cartridge visible and place thecartridge in the outlet housing with thesingle-hole end visible.NOTEThe pump will not operateproperly unless the cartridge isinstalled in the housing in thecorrect orientation. Liquid flowsthrough the check valve in thelarge single hole and out thesmall double holes.Double-holeInletCheckValveSingle-holeOutletCheckValve7. Install the inlet check valve assembly (P/N 045722) on the bottom of theprimary pump head. Install the outlet check valve assembly (P/N 045721) onthe top of the head. Tighten the check valves fingertight, and then use awrench to tighten an additional one-quarter to one-half turn.Overtightening may damage the pump head and check valve housingand crush the check valve seats.8. Reconnect the liquid lines. Turn on the <strong>ICS</strong>-<strong>1000</strong> main power.9. Open the eluent valve from the <strong>ICS</strong>-<strong>1000</strong> Control Panel in Chromeleon.10. Prime the pump (see Section B.12).11. When the <strong>ICS</strong>-<strong>1000</strong> is at operating pressure, check for leaks from the checkvalves. Tighten a check valve a little more only if it leaks.Cleaning Check Valves1. Carefully remove the check valve cartridges from the valve housings.2. Place the check valve housings and cartridges in a beaker with methanol.Sonicate or agitate the parts for several minutes.3. Rinse each check valve housing and cartridge thoroughly with filtereddeionized water.4. See Step 6 through Step 11 above to reinstall the check valves and completethe procedure.5-12 Doc. 031879-01 3/03

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!