13.07.2015 Views

ICS-1000 Ion Chromatography System Operator's Manual

ICS-1000 Ion Chromatography System Operator's Manual

ICS-1000 Ion Chromatography System Operator's Manual

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Installing and Plumbing the Columns and SuppressorB.9 Installing and Plumbing the Columns and SuppressorNOTEThis section provides brief installation and plumbinginstructions for the columns and suppressor. Beforebeginning the installation, refer to the column andsuppressor manuals for detailed start-up andinstallation instructions. The manuals are provided onthe Dionex Reference Library CD-ROM (P/N 053891),which is located in the <strong>ICS</strong>-<strong>1000</strong> Ship Kit (P/N 057905).Before beginning:• Remove the guard column, separator column, and suppressor from theirboxes.• Remove the fitting plugs from the ends of each column and from all ports onthe suppressor.• Discard any tubing temporarily connecting the suppressor ports.B.9.1Column Heater Setup (Optional)Follow the steps below if the optional column heater is installed.1. Cut off the twoshipping ties fromthe column heaterand remove them(see Figure B-17).2. Loosen the twothumbscrews onthe heater cover(they remainattached to thecover).3. Pull the heatercover straight outto remove it.Thumbscrew (2)Shipping Tie (2)Figure B-17. <strong>ICS</strong>-<strong>1000</strong> Column Heater SetupDoc. 031879-01 3/03 B-19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!