13.07.2015 Views

ICS-1000 Ion Chromatography System Operator's Manual

ICS-1000 Ion Chromatography System Operator's Manual

ICS-1000 Ion Chromatography System Operator's Manual

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>ICS</strong>-<strong>1000</strong> <strong>Ion</strong> <strong>Chromatography</strong> <strong>System</strong>PCSee ComputerPeak ghosting, 4-16Peak heightReproducibility, 2-27Troubleshooting, 4-17PeaksExtraneous (ghosting), 4-16PEEKConductivity cell body, 2-27Physical specificationsDecibel level, A-1Dimensions, A-1Weight, A-1Piston sealsReplacement procedure, 5-13 – 5-14,5-16 – 5-17PistonsReplacement procedure, 5-17Plotting detector output, 2-18PlumbingColumns and suppressor, B-25Injection valve, 5-10Replacing tubing and fittings, 5-9Troubleshooting, 5-7PowerTurning on, 3-3, B-12Power cord, 5-30, B-11Power receptacle, 2-8, B-11Power requirements, A-1Power-up conditions, 3-3PressureLimit, 4-7Pump operating specifications, A-2<strong>System</strong>, 4-6 – 4-7Pressure ripple, A-2Pressure slope calibration error, 4-5Pressure transducer, 2-5, 2-23Leaking, 4-10<strong>System</strong> backpressure, 2-23PressurizingEluent reservoir, B-48Priming, 3-9, 5-29, B-36 – B-38Pump is out of prime, 4-12With a syringe, B-36With isopropyl alcohol, 5-29With the Prime button, B-38Priming valveOpening, 2-22O-ring replacement procedure, 5-18Printing, E-1Processing samples, 3-2, 3-18 – 3-19Automatically (batch), 3-2, 3-19<strong>Manual</strong>ly, 3-2, 3-18Product warranty, 5-1Program time, 2-15Programs (Chromeleon), 2-11, 2-15, 3-16 –3-19Run time, 2-15Pulse damper, 2-10, 2-23Pump, 2-21Flow rate, 2-5Leaks, 4-10Operating pressure, A-2Over pressure alarm, 4-6Primary pump head, 2-21Priming, 3-9, B-36Priming problems, 4-11Secondary pump head, 2-22Troubleshooting, 4-13Under pressure alarm, 4-7Pump check valve leaking, 4-9Pump components, 2-21Pump degasSee Vacuum degas assemblyPump head waste valveLeaking, 4-10O-ring replacement procedure, 5-18Pump heads, 5-11Pump motor lost control alarm, 4-5Pump pressure hardware error, 4-6Pump priming valveO-ring replacement procedure, 5-18Pump specificationsFlow rate, A-2Operating pressure, A-2Type, A-2Index-6 Doc. 031879-01 3/03

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!