13.07.2015 Views

ICS-1000 Ion Chromatography System Operator's Manual

ICS-1000 Ion Chromatography System Operator's Manual

ICS-1000 Ion Chromatography System Operator's Manual

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5•ServiceValve KnobO-Ring(P/N 055752)Figure 5-8. Waste Valve or Priming Valve O-Ring Replacement5. Slide a new O-ring (P/N 055752) over the end of the valve.6. To reinstall the valve containing the new O-ring, turn the knob clockwise andthen tighten fingertight.NOTEIt is normal to encounter resistance after severalrotations of the knob; the O-ring is being pushedinto the cavity of the pump head.7. Turn on the main power switch.8. Open the eluent valve.9. Prime the pump (see Section B.14).Doc. 031879-01 3/03 5-19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!