13.07.2015 Views

ICS-1000 Ion Chromatography System Operator's Manual

ICS-1000 Ion Chromatography System Operator's Manual

ICS-1000 Ion Chromatography System Operator's Manual

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>ICS</strong>-<strong>1000</strong> <strong>Ion</strong> <strong>Chromatography</strong> <strong>System</strong>3.10 Loading and Injecting SamplesSamples can be loaded into the sample loop through the injection port on the frontdoor using a syringe or vacuum syringe, or they can be loaded using anautosampler.For autosampler injections, the injection port tubing is disconnected from the <strong>ICS</strong>-<strong>1000</strong> injection valve and replaced by the autosampler outlet tubing. Other setuprequirements depend upon the model of autosampler.Setup for an AS40 AutosamplerA relay or TTL connection is required for Chromeleon to control sample loading.See Section B.18 for AS40 autosampler installation instructions.Setup for an AS50 AutosamplerTo use an AS50 autosampler with the <strong>ICS</strong>-<strong>1000</strong>, the AS50 must meet thefollowing requirements:• An injection valve cannot be installed in the AS50• The AS50 must have Moduleware version 1.11 or later installed• Control of the <strong>ICS</strong>-<strong>1000</strong> injection valve must be enabled in the AS50The following AS50 models are configured at the factory to meet the aboverequirements:• AS50 without injection valve (P/N 061309)• AS50 without injection valve; with sample preparation (P/N 061310)• AS50 without injection valve; with sample preparation and sample traycooling (P/N 061311)• AS50 without injection valve; with sample tray cooling (P/N 061312)See Section B.17 for AS50 autosampler installation instructions.After the AS50 is configured for use with the <strong>ICS</strong>-<strong>1000</strong>, all AS50 modes ofinjection (full-loop, partial-loop, and partial-loop limited-sample) are supported.In addition, all AS50 injection valve commands (whether issued from the AS50front panel or from Chromeleon) will control the <strong>ICS</strong>-<strong>1000</strong> injection valve. ForChromeleon control, the AS50 must be added to the <strong>ICS</strong>-<strong>1000</strong> timebase (seeSection B.8). For front panel control, the AS50 and <strong>ICS</strong>-<strong>1000</strong> can be set up for3-14 Doc. 031879-01 3/03

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!