13.07.2015 Views

ICS-1000 Ion Chromatography System Operator's Manual

ICS-1000 Ion Chromatography System Operator's Manual

ICS-1000 Ion Chromatography System Operator's Manual

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ICS</strong>-<strong>1000</strong> <strong>Ion</strong> <strong>Chromatography</strong> <strong>System</strong>B.14 Priming the Pump1. Verify that the eluent reservoir is filled, the reservoir cap is installed and handtightened, and the liquid line from the <strong>ICS</strong>-<strong>1000</strong> to the reservoir cap isconnected (see Section B.11).2. Verify that the waste lines are directed to a waste container.3. The priming procedure consists of two parts:• Priming the eluent lines with a syringe. Perform this procedure at initialinstallation, after changing eluents, or when eluent lines are empty.• Priming the pump heads with the Prime button. Perform this procedureafter the eluent lines are primed.B.14.1 Priming the Eluent Lines with a SyringeNOTEPrime the eluent lines after initial installation, afterchanging eluents, or when eluent lines are empty.1. Verify that the pump is turned off.2. Connect a 10 mL syringe (P/N 054578) to the port in the primingvalve on the primary pump head (see Figure B-35).SecondaryPump HeadWaste Valve(close)PortPrimaryPump Head10 mL Syringe(P/N 054578)Priming Valve(open)Figure B-35. Priming the Eluent LinesB-36 Doc. 031879-01 3/03

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!